Grounded MSC Napoli to be Refloated

Monday, July 09, 2007
According to reports, work will begin on Monday to refloat the container vessel MSC Napoli six months after it ran aground off the Devon coast, the Maritime & Coastguard Agency said.

Engineers will aim to pump out 58,000 tons of water during the next three days in an attempt to prevent it breaking up and damaging the environment.

A barge with winches and cranes, along with tugs and an anti-pollution vessel are at sea to help in the operation.

More than two thousand containers and 3,000 tons of fuel oil have already been removed from the vessel which was deliberately beached off Branscome in January to prevent it sinking after being holed during storms. About 200 containers fell off and some reached the shore, sparking a looting spree.

It should take six hours to remove the water, but salvagers need three days of good weather to get the shipwreck in a holding position before deciding what to do next. The decision to refloat the vessel was taken by Robin Middleton, the secretary of state's representative in maritime salvage and intervention, after reviewing the condition of the ship and the prevailing weather conditions in Lyme Bay.

Source: Reuters

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Wood Group Bags Statoil MSA

Wood Group has been awarded an evergreen master services agreement (MSA) by Statoil to support the life cycles of its offshore  and onshore facilities. Work and

Russian Shipbuilder Wins $1 bln Iran Oil Rig Deal

Russian shipbuilder Krasnye Barrikady has been awarded a near-$1 billion contract by Iran to build five offshore drilling rigs for use on Iran's part of the Gulf shelf,

Salvage

Returning to the Scene of the Shipwrecks

A participant in a diving field school last fall, graduate student Tori Kiefer is back to help a new set of students learn the joy of surveying shipwrecks.   Last fall,

Grounded Bulker Repaired, Heads for Japan

The Captain of the Port for Oregon and southern Washington canceled the captain of the port order on the motor vessel Sparna allowing the vessel to leave its mooring at Kalama, Wash.

Ardent Earns ISO 9001:2015 Certification

Ardent, formed just over a year ago as a merger of A.P. Moller-Maersk’s Svitzer Salvage and Crowley’s Titan Salvage, has been issued the ISO 9001:2015 Certification

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Offshore Oil Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0729 sec (14 req/sec)