Gulf Marine Wins Matterhorn TLP Contract

Thursday, January 31, 2002
Technip-Coflexip Group announced that Atlantia Offshore Limited has awarded Gulf Marine Fabricators (GMF) a fabrication contract for the Matterhorn dry-tree TLP topsides facility and foundation piles. GMF based in Aransas Pass is an entity of the Technip-Coflexip Group. The work scope includes procurement, fabrication and outfitting of a 6000-ton topsides facility with a height of 62 ft. and an area of approximately 63,484 square ft. The scope also includes the fabrication of 6 piles each 96 in. in diameter and 415 ft. long. The piles have a total weight of 2100 tons. The mini-TLP platform will be installed at Mississippi Canyon Block 243 in 2,800 ft. of water. GMF will perform this work at its North Yard located in Aransas Pass, Texas. The topsides work will commence the first quarter of 2002 with completion in May 2003. The pile work is also scheduled to start during the first quarter of 2002 with a completion date in July 2002.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Gazprom Transgaz Ufa Organizes Arts Festival

Over 200 healthy children and children with disabilities from Bashkortostan as well as the Volga Region participated in the Breaking the Barriers second interregional children’s arts festival,

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

Steven Palazzo Visits HII, Newport

Huntington Ingalls Industries today hosted Rep. Steven Palazzo, R-Miss., for a tour of the company's Newport News Shipbuilding division. Palazzo represents the fourth district of Mississippi,

Offshore

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

China Building Island Big Enough for Airstrip

Satellite images show China is building an island on a reef in the disputed Spratly Islands large enough to accommodate what could be its first offshore airstrip in the South China Sea,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Port Authority Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3790 sec (3 req/sec)