Höegh LNG and Mitsui OSK Lines Confirm LNG Re-gasification Vessels

Thursday, March 29, 2007
Höegh LNG and Mitsui OSK Lines, Ltd. (MOL) confirm the signing of long term time charter parties for two Shuttle and Regasification Vessels (SRV) with SUEZ LNG Trading SA. These vessels are specifically designed to service an offshore natural gas import terminal to be built in Massachusetts Bay offshore the city of Boston on the US East Coast. The vessels will be delivered in 2009 and 2010. The SUEZ owned Neptune LNG LLC received the final license issued by MARAD for the construction of the terminal on 23 March. Environmental awareness and safety The LNG re-gasification vessels and the deepwater port installations can meet the most stringent environmental regulations anywhere in the US for such terminal facilities. By placing the terminal services offshore there is no need for land-based terminals that could affect the local environment. The transportation of LNG by ship has an outstanding track record when it comes to safety.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

List: Top Five UK Ship Owners

Following last week's landmark referendum results, VesselsValue has compiled a list of the top five U.K.-based shipowners and their total fleet value in USD billions.

FMC's Doyle Addresses VGM Rules

U.S. Federal Maritime Commission (FMC) Commissioner William P. Doyle issued a statement on the upcoming implementation of the SOLAS Convention’s verified gross mass (VGM) requirements:   On Friday,

Maritime Knowledge Hub Opens in the UK

Business owners across the U.K. wanting to drive growth in the maritime sector are being urged to engage with the newly opened Maritime Knowledge Hub in Birkenhead, Liverpool City Region.

Coast Guard

ClassNK to Perform AWO Responsible Carrier Audits

The American Waterways Operators (AWO) and ClassNK have signed an agreement under which ClassNK will be authorized to conduct audits of AWO's Responsible Carrier Program,

Waterway Reopened after Barge Grounding

The U.S. Coast Guard has opened the Red River from mile marker 40 to mile marker 42 for vessel traffic, Monday.   The Red River had been closed due to a barge that had run aground at mile marker 41,

Red River Closed after Barge Grounding

The Red River was closed Sunday from mile marker 40 to mile marker 42, after a barge reportedly ran aground and was protruding into the channel near mile marker 41, according to the U.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0853 sec (12 req/sec)