Harvey Gulf Awarded Contract

Friday, February 01, 2008
Harvey Gulf International Marine, Inc. is proud to announce that it has been awarded a three (3) year contract from ENI Petroleum for their 240 Ft. ABS Certified DP-2, Offshore Supply Vessel “Harvey Provider,” which would be enhanced with a ”Reel Storage System” beginning in June 2008.

This “Reel Storage System” will be used to carry 800 metric tons of polyester rope or 90,000 feet of 3.75 inch wire rope that will enable the Transocean Amirante to be moored in greater water depths than its conventional mooring system allows by utilizing a 12 line, preset suction pile system. This vessel will allow ENI to reduce the number of days the company would have to spot charter hire AHTS vessels which will equate to huge financial savings to the company.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Vigor’s Tacoma Yard Delivers Breasting Barges to Foss

Vigor Industrial expands its newbuild capacity in Washington; Tacoma yard delivers three breasting barges   Fabrication teams at Vigor Industrial’s Tacoma, Wash.

Hands Across the Water

U.S. firms leverage Netherlands-based Damen Shipyard’s vessel designs and technical support. For nearly 40 years, Damen Shipyards Group in the Netherlands has

Icebreakers Ordered for Neft’s Novy Port Project

Aker Arctic’s icebreaker design selected for Gazprom Neft’s Novy Port project   Aker Arctic and Vyborg Shipyard have confirmed a contract for the design of two

Education/Training

Dual Accreditation for VSTEP DP Simulators

In a timespan of one month, three types of VSTEP Dynamic Positioning Simulators have been officially certified and accredited by the Nautical Institute and Det

Capt. Ang Chin Eng New Technical Director of SSA

The Singapore Shipping Association (SSA) has appointed a full time Technical Director who will be responsible for ensuring the Association maintains its pledge

Australia: Submarines Excluded from Shipbuild Review

The Australian Navy’s future submarine project has been excluded from the country's shipbuilding review on advice from the Abbott government that the new fleet would be built offshore.

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1194 sec (8 req/sec)