HB Rentals Installation While Underway

Thursday, February 25, 2010
Photo courtesy Foster Marketing Communications

Accommodations specialist, HB Rentals, a Superior Energy Services company, installed a six-building accommodations package on the Siem Dorado vessel for use in the Gulf of Mexico.  In order to help the client stay on schedule, HB Rentals completed the installation while the vessel was in transit.

The package includes six ABS- and USCG-compliant twelve-man sleeper units, which will be stacked two high and three wide.  HB will also install platforms, stairways, gas detection, pressure sets, sewage treatment systems, lift pumps, transformers and distribution panels to accompany the buildings. These units will be used for six months at an estimated value of $815,000.

(www.hbrental.com)
 

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

DP World Receives 1st Scheduled Vessel at New Terminal

DP World has yesterday welcomed the first scheduled vessel to call at its new Container Terminal 3 in Jebel Ali, Dubai, as it gears up to serve customers at the state-of-the-art facility.

Kalmar 5th Generation Gloria Reachstackers Enter US

Kalmar, part of Cargotec, is launching its highly acclaimed range of reachstackers, called Gloria into the Americas. The eagerly awaited launch follows the successful

Foster Wheeler & MDM Engineering Merged

Foster Wheeler AG announced today that an indirect wholly owned subsidiary of the Company has completed the acquisition of MDM Engineering Group Limited (“MDM”)

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Port Authority Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1571 sec (6 req/sec)