Husky Energy Awards $250 M Contract For White Rose

Wednesday, September 04, 2002
Husky Energy Inc. has awarded a $250 million contract for the subsea production system for the White Rose oil field project, located 217 miles off the east coast of Newfoundland and Labrador. The contract covers the design, supply and installation of the subsea system for the White Rose project. Husky plans to use a floating production, storage and offloading (FPSO) vessel to develop the offshore field. The subsea production system includes a total of 42 kilometres of flexible risers, flowlines and umbilicals, five subsea manifolds, up to 21 Christmas trees and wellheads distributed across three Glory Hole sites. Glory Holes are depressions in the ocean floor excavated to provide protection for the subsea production equipment. The contract has been awarded to Technip CSO Canada Ltd., which is a Newfoundland-based affiliate of Paris-based Technip-Coflexip. The contract also contains an option for Technip CSO Canada to carry out the installation of the mooring system for the White Rose FPSO. "The White Rose project will benefit Newfoundland and Labrador, and the offshore oil industry," said Mr. John C.S. Lau, President and Chief Executive Officer of Husky Energy. "This contract is a key part of the total White Rose project development."
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

US Oil Platform on Fire in Gulf Of Mexico

An oil platform caught fire and was evacuated in the U.S. Gulf of Mexico offshore Louisiana in the early hours of Friday, though no injuries were reported, the U.

IMO Adopts Polar Code Environmental Provisions

United Nations' International Maritime Organization (IMO) has adopted the environmental part of the Polar Code. Hereby, internationally binding regulations on

Two Hurt in Petrobras Platform Accident; Output Halted

Brazil's state-led oil company Petrobras was forced to stop output at its P-56 offshore oil production ship on Wednesday in the Marlim Sul field after an explosion

Ports

USCG Tall Ship Sailing to the Bahamas

The U.S. Coast Guard Cutter Eagle is scheduled to arrive at Berth 14 at Prince George Wharf in Nassau, Bahamas on Thursday, May 28 as part of its 2015 cadet summer training deployment.

Shipping Freight Rates Drop Amidst Overcapacity

Shipping freight rates on the world's busiest route, from Asia to Northern Europe, fell by the largest percentage amount since 2008, reflecting wild volatility

WFP: Aid Cargo for Yemen will be Delivered After Ship Docks

The World Food Programme will deliver a cargo of Iranian aid for Yemen once the ship carrying it reaches Djibouti's port, the U.N agency said on Friday. Earlier

 
 
Maritime Standards Naval Architecture Navigation Pipelines Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1185 sec (8 req/sec)