Industry Collaborates with ShipConstructor

Tuesday, July 21, 2009

"ShipConstructor's software is widely used at U.S. shipyards so it was natural for our industry group to collaborate with them," said Don Sauvage of Northrop Grumman.

ShipConstructor has recently completed a series of meetings with US shipbuilders and design firms regarding methods for enhancing Design for Production (DFP).

These meetings have been part of a project funded by the National Shipbuilding Research Program (NSRP) involving Northrop Grumman (Avondale & Pascagoula), Bollinger Shipyards, Marinette Marine, VT Halter Marine, as well as Genoa Design.

The goal of DFP is to optimize design for efficient production so the team members identified two software functionalities as practical applications.

The first was the use of standard assemblies during the 3D modeling process. This would involve the creation of standard components that followed DFP principles. These components could then be reused anywhere within the model to ensure consistency.

The second functionality was a rule-based program for the creation of distributed systems supports. To optimize DFP, the supports for a ship's pipes and HVAC components (distributed systems) need to be designed in a specific way depending on the system's location, configuration and materials used. This is a complex task so a rule-based program would be of assistance.

Industry representatives have collaborated with ShipConstructor in the development of both identified functionalities which will be included in the upcoming ShipConstructor 2008 R5 software release.

(www.shipconstructor.com)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Naval Architecture

Strategic Marine Building Luxury Crewboat

Strategic Marine announced the kick-off of its first collaboration with PT. Pelayaran Tanjung Kumawa, expecting to deliver an exclusive luxury crewboat in November this year.

Queen Mary 2 set for Extensive Blohm + Voss Refit

On May 27, at 8:00 PM, the Queen Mary 2 docked at Blohm+Voss at dry dock ELBE 17, well-known to the ocean liner. There, the flagship of the long-established British

Tech & Design Solutions for Modern Workboats

EPA Tier 4 regulations (for engines of 804 hp and higher) and propulsion advancements have many manufacturers and vessel designers changing course to adapt to new requirements and customer demands.

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0865 sec (12 req/sec)