Industry Collaborates with ShipConstructor

Tuesday, July 21, 2009

"ShipConstructor's software is widely used at U.S. shipyards so it was natural for our industry group to collaborate with them," said Don Sauvage of Northrop Grumman.

ShipConstructor has recently completed a series of meetings with US shipbuilders and design firms regarding methods for enhancing Design for Production (DFP).

These meetings have been part of a project funded by the National Shipbuilding Research Program (NSRP) involving Northrop Grumman (Avondale & Pascagoula), Bollinger Shipyards, Marinette Marine, VT Halter Marine, as well as Genoa Design.

The goal of DFP is to optimize design for efficient production so the team members identified two software functionalities as practical applications.

The first was the use of standard assemblies during the 3D modeling process. This would involve the creation of standard components that followed DFP principles. These components could then be reused anywhere within the model to ensure consistency.

The second functionality was a rule-based program for the creation of distributed systems supports. To optimize DFP, the supports for a ship's pipes and HVAC components (distributed systems) need to be designed in a specific way depending on the system's location, configuration and materials used. This is a complex task so a rule-based program would be of assistance.

Industry representatives have collaborated with ShipConstructor in the development of both identified functionalities which will be included in the upcoming ShipConstructor 2008 R5 software release.

(www.shipconstructor.com)

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Naval Architecture

Rederij Groen Takes Delivery of 7-Waves

Rederij Groen’s entire SRSV fleet built by Damen Maaskant Shipyards Stellendam. Dutch offshore services company Rederij Groen has taken delivery of the 7-Waves,

New Research Vessel Delivered on the Great Lakes

The new oceanographic research and fisheries assessment vessel, Arcticus, completed her sea trials and was delivered to the U.S. Geological Survey's Great Lakes Science Center on October 17.

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1165 sec (9 req/sec)