Insurer Not Liable for Yard Repairs Beyond Warranty period

Friday, September 12, 2003
In an unpublished opinion, the U.S. Court of Appeals for the Fifth Circuit ruled that insurers are not obligated to reimburse a shipyard for the cost of repairs made to ships when the defects were not discovered during the warranty period. In the instant case, the shipyard built four lift boats. The contracts included a warranty and an obligation to repair and replace defects discovered within 180 days of delivery. The insurers provided coverage for the shipyard for, among other things, sums that the shipyard became legally obligated to pay under its contracts. Cracks were discovered in the jack-up legs approximately three years after delivery.

The cracks were found to have been caused by faulty welds by the shipyard. The shipyard repaired the jack-up legs and filed claims for reimbursement with the insurers, who then brought a declaratory judgment action. The court held that, while there may have been good business reasons for the shipyard standing behind its work well beyond the warranty period, the insurers were justified in refusing to reimburse the shipyard for such repair work. XL Specialty Insurance Company v. Bollinger Shipyards Lockport LLC , No. 02-30387 (5th Cir., September 10, 2003). (Source: HK Law)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Kongsberg Tech for Peruvian Arctic Research Vessel

Kongsberg Maritime has been chosen to deliver an integrated subsea technology systems package including two HUGIN Autonomous Underwater Vehicles (AUV) for a new

Technip Bags Statoil's Umbilical Supply Contract

Technip’s wholly-owned subsidiary Technip Umbilicals Ltd.(1) has been awarded a contract by Statoil ASA to supply the umbilical(2) to the Oseberg Vestflanken 2 field offshore Norway.

Damen Unveils Multi-role Utility Vessel

Work is due to start shortly on the first of a new class of Damen utility vessel UV2410.   This multi-role platform is the result of extensive consultation with

Ship Repair & Conversion

Damen's Oranjewerf Yard ISO 9001:2008 Certified

Damen Shiprepair Oranjewerf (DSO) has become the latest Damen ship repair yard to receive ISO 9001:2008 certification, demonstrating that the yard fulfils the requirements

Davie Begins First Resolve-Class AOR Conversion

Davie Shipbuilding has cut first steel for the Resolve Class Auxiliary Oiler Replenishment vessel.   The project consists of converting a containership into an

Danelec Bags Multiple VDR Orders in Middle East

Danelec Marine, along with distribution partner Elcome International, is to supply Danelec DM100 Voyage Data Recorders (VDRs) for 14 ships in the Middle East.   The

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0554 sec (18 req/sec)