Insurer Not Liable for Yard Repairs Beyond Warranty period

Friday, September 12, 2003
In an unpublished opinion, the U.S. Court of Appeals for the Fifth Circuit ruled that insurers are not obligated to reimburse a shipyard for the cost of repairs made to ships when the defects were not discovered during the warranty period. In the instant case, the shipyard built four lift boats. The contracts included a warranty and an obligation to repair and replace defects discovered within 180 days of delivery. The insurers provided coverage for the shipyard for, among other things, sums that the shipyard became legally obligated to pay under its contracts. Cracks were discovered in the jack-up legs approximately three years after delivery.

The cracks were found to have been caused by faulty welds by the shipyard. The shipyard repaired the jack-up legs and filed claims for reimbursement with the insurers, who then brought a declaratory judgment action. The court held that, while there may have been good business reasons for the shipyard standing behind its work well beyond the warranty period, the insurers were justified in refusing to reimburse the shipyard for such repair work. XL Specialty Insurance Company v. Bollinger Shipyards Lockport LLC , No. 02-30387 (5th Cir., September 10, 2003). (Source: HK Law)

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

DNV GL’s Synergi to Manage Siem Offshore Newbuilding Projects

Siem Offshore has chosen DNV GL’s Synergi Project to manage nine newbuilding projects. Synergi Project software The software is used to optimize the collaboration

Huawei Bags MCT Submarine Cable Contract

Huawei Marine has signed a system design and construction agreement with a consortium comprising Telekom Malaysia Berhad, Symphony Communication and Telcotech

U.S. Senators Urge Obama to Block Arctic Oil Drilling

A group of 18 mostly Democratic U.S. senators on Friday urged the Obama administration to stop Royal Dutch Shell's preparations for oil exploration in the Arctic,

Ship Repair & Conversion

US Funding for Air Emissions/Alternative Energy Projects

The U.S. Maritime Administration (MARAD) announced that up to $1.3 million in Federal funding is now available through cooperative agreements for projects supporting

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0841 sec (12 req/sec)