J. Ray McDermott Wins Chevron Platong Gas II Project

Friday, March 28, 2008

J. Ray McDermott S. A. said that subsidiaries of the company were recently awarded an engineering, procurement, construction and installation contract by Chevron Thailand Exploration and Production for the Platong Gas II Project in the .
The contract encompasses the full EPCI scope associated with the project’s central processing platform, representing a float-over deck weight of approximately 19,000 tons. Additional work in the contract includes J. Ray providing EPCI services for the associated living-quarters platform, flare tripod and three bridges.  Engineering work has commenced at J. Ray’s office and installation is expected in the by the end of 2010.

Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Kruszewski Joins Braemar Engineering

Braemar Engineering, the specialist maritime engineering consultancy, today announced the appointment of Chis Kruszewski to the role of Senior Electrical Engineer in its Offshore,

RigNet Partners Inmarsat to Offer Fleet Xpress

RigNet, Inc., a global provider of remote managed offshore communications solutions, telecoms systems integration services and collaborative applications to the oil and gas industry,

Italy's Eni Arrives Arctic as Shell Departs

As Shell retreats from the Arctic, the Italian oil giant Eni is making final preparations for its own oil exploration venture in the Norwegian Arctic, reports the Guardian.

Maritime Careers / Shipboard Positions Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1695 sec (6 req/sec)