J. Ray McDermott Wins Offshore LNG Contract

Tuesday, September 27, 2005
McDermott International, Inc. announced that a subsidiary of J.Ray McDermott, S.A. has been awarded a contract by Ras Laffan Liquefied Natural Gas Company Limited (3) to provide engineering, procurement, construction and installation services for new facilities in Qatar’s North Field, as part of the Phase 2 Offshore Expansion Project. Contracts of this type are typically valued at approximately $0.5 billion.

“RasGas is a valued client of J. Ray and its trust in our management, operations and quality of services explains the repeatability in our project work and the longevity of our relationship,” said Bob Deason, President and Chief Operating Officer of J. Ray. “We are extremely familiar with the existing facilities and field location, having constructed all of RasGas’ offshore platform facilities to date. This project truly highlights J. Ray’s global capabilities as a dependable, world-class offshore solutions provider in managing such a large scale project.”

The Phase 2 Expansion Project includes two LNG processing trains, and the development of offshore facilities to supply feed gas produced from the North Field to the onshore LNG Train 6, and subsequently Train 7. J. Ray will perform the engineering, procurement, construction and installation of two sets of topsides for the Train 6 remote unmanned wellhead platforms WH6 and WH8, weighing approximately 2,200 short tons each; the jackets of which J. Ray recently engineered and installed under the Phase I expansion project.

The project also requires EPCI of two 38” wet-gas export trunk-lines and risers, approximately 62 miles long, from WH6 and WH8 to onshore receiving facilities. Two separate combined power and fiber optic subsea communications cables will be installed to connect the existing RasGas Alpha Complex to the two new platforms, WH6 and WH8. The cable length to WH6 will be approximately 16 miles and approximately 21 miles to WH8. J. Ray’s work on Train 7 facilities initially will be limited to hook-up and mechanical completion of additional wells on existing live gas production platforms.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

EU Regs on Ship CO2 Reporting Complicates IMO Agreement

ICS Concerned that EU will Preempt IMO CO2 Negotiations.   The global trade association for shipowners – the International Chamber of Shipping (ICS) – is disappointed

New Players in Singapore Markets in OW's Absence

The downfall of a leading marine fuel supplier that prompted sellers to tighten credit terms in Singapore is skewing the post-OW Bunker jostle for market share

Japan Military Wants China "Crisis Management" Pact

Japan's highest-ranking military officer on Friday urged an early start to a "crisis management" mechanism with China amid conflicting claims to a group of tiny East China Sea islands.

LNG

World’s First LNG-Ready Ultra Large Container Ship Named

The race is on in global maritime circles to be the “world’s first” in every aspect of environmental friendliness, particularly in regards to the incorporation of LNG as fuel onboard commercial ships.

ClassNK Approves Niigata Dual-fuel Engine Design

Classification society ClassNK has granted approval to the design of the new 28AHX-DF dual-fuel engine developed by Niigata Power Systems Co., Ltd. The new engine

Massive LNG Absorber Shipped to Malaysia

Successful transport of 1,480t absorber for biggest LNG plant worldwide in Malaysia.   1,480 tons and a high center of gravity made the transport of an absorber

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0986 sec (10 req/sec)