J. Ray Wins More Work in Saudi Arabia

Thursday, March 12, 2009

J. Ray McDermott, S.A., a subsidiary of McDermott International, Inc., announced that it was recently awarded additional work under the Long-Term Agreement (LTA) with Saudi Aramco.

This latest project, which is expected to continue through 2010, consists of the procurement, fabrication and installation of three decks, jackets, associated pipelines, and the installation of three new shallow water crude oil pipelines, totaling 15 kilometers in length, in the South Safaniya oil field, offshore Saudi Arabia. The pipelines will divert crude oil production flow from three existing platforms to other facilities before reaching the Safaniya onshore Gas Oil Separator Plant. 

J. Ray McDermott’s first project for Saudi Aramco in the Safaniya field was in 1972 when it constructed 14 platforms and laid 77 kilometers of pipeline.

Other recently awarded Saudi Aramco work under the LTA includes the procurement, fabrication and installation of a jacket and deck for the Berri field and a four-pile jacket in the Karan field, offshore Saudi Arabia.

Rabih Makarem, LTA Project Manager for J. Ray McDermott, added, “We were recently awarded the 2007 Contractor Excellence Award and two Safety Recognition Awards for our performance on Saudi Aramco projects.”

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Study: An Arctic Oil Well Blowout Could Spread More Than 1,000km

Oil from a spill or oil well blowout in the Arctic waters of Canada's Beaufort Sea could easily become trapped in sea ice and potentially spread more than 1,000 kilometres to the west coast of Alaska,

Westermeerwind Wind Farm Construction Begins

Mammoet announced today that Westermeerwind BV has reached financial close on July 25 for the turnkey construction of the Westermeerwind wind farm in Ijsselmeer,

Gas Prices Help Offset Statoil's Output Drop

Statoil's second quarter 2014 net operating income was NOK 32 billion, a decrease of NOK 2.3 billion compared to the second quarter of 2013. Adjusted earnings were NOK 32.

 
 
Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1030 sec (10 req/sec)