Jadaf Dubai Carries out First Ship Lift

Thursday, April 19, 2007
Jadaf Dubai has achieved its first ship lift at its new facility in Dubai Maritime City. The operation involved hoisting a ship weighing 2,500 tons and transporting it safely to the ship repair yard's new maintenance workshop on the man-made peninsula. It was carried out by the technical management team of Jadaf Dubai in the presence of a number of officials and marine engineers from DD World and Dubai Maritime City, using the new custom-made mega crane installed at the company's new docks.

The massive ship lift, 90 meters long, 25 meters wide and 14 meters in depth, is installed in the 100 meter long berth, and has a capacity to lift ships weighing up to 3,000 tons. An even larger ship lift designed to service vessels weighing up to six thousand tons will be installed in an adjacent 150-meter long dock that will house 11 berths. Jadaf Dubai, which began operations in 1978, provides comprehensive maintenance and repair services to owners of small and mid-sized vessels, large wooden boats, luxury yachts and cruise ships. The latest successful ship lifting operation marks the beginning of a new stage for Jadaf Dubai as it moves to strengthen its position as the region's premier maritime service provide in its category of business. Source: AME Info.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

2 Americans Rescued North of Cuba

A Coast Guard MH-60 helicopter crew rescued two American sailors whose vessel ran aground approximately 25 miles north of Gibara, Cuba, Friday. Watchstanders

Shell CEO Backs Fossil Fuels, Climate Change Warnings

The world's fossil fuel reserves cannot be burned unless some way is found to capture their carbon emissions, Royal Dutch Shell Plc Chief Executive Officer Ben van Beurden said on Friday.

Severe Flooding Cuts Off Lone Road to Alaska's Oilfield

Alaska's lone road to North Slope oil field operations remains closed for the third time in two months while emergency crews continue to redirect flooding from an adjacent river,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2241 sec (4 req/sec)