Jadaf Dubai Carries out First Ship Lift

Thursday, April 19, 2007
Jadaf Dubai has achieved its first ship lift at its new facility in Dubai Maritime City. The operation involved hoisting a ship weighing 2,500 tons and transporting it safely to the ship repair yard's new maintenance workshop on the man-made peninsula. It was carried out by the technical management team of Jadaf Dubai in the presence of a number of officials and marine engineers from DD World and Dubai Maritime City, using the new custom-made mega crane installed at the company's new docks.

The massive ship lift, 90 meters long, 25 meters wide and 14 meters in depth, is installed in the 100 meter long berth, and has a capacity to lift ships weighing up to 3,000 tons. An even larger ship lift designed to service vessels weighing up to six thousand tons will be installed in an adjacent 150-meter long dock that will house 11 berths. Jadaf Dubai, which began operations in 1978, provides comprehensive maintenance and repair services to owners of small and mid-sized vessels, large wooden boats, luxury yachts and cruise ships. The latest successful ship lifting operation marks the beginning of a new stage for Jadaf Dubai as it moves to strengthen its position as the region's premier maritime service provide in its category of business. Source: AME Info.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Liebherr to Deliver RTGs to Mayotte and Manila

Liebherr confirms orders for variable speed RTGs and electric RTGs. DPWorld Asian Terminals Inc. has placed an order with Liebherr Container Cranes for a further 5 RTGs at its Manila facility.

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

DP World Receives 1st Scheduled Vessel at New Terminal

DP World has yesterday welcomed the first scheduled vessel to call at its new Container Terminal 3 in Jebel Ali, Dubai, as it gears up to serve customers at the state-of-the-art facility.

 
 
Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2024 sec (5 req/sec)