James P. Colie & Assoc. Refurbishes Sovereign of the Seas

Wednesday, July 28, 1999
Marine interior contractor, James P. Colie & Associates, announced it is near completion of interior refurbishment work on Sovereign of the Seas for Royal Caribbean International. The dry-dock was May 3 - May 21, 1999 at Atlantic Marine in Mobile, Ala. A crew of 100 from James P. Colie & Associates replaced the interiors of the Windjammer Café, 15 public restrooms, Ship Shape Center and the stair landings from Deck 4 to Deck 12. In the Windjammer Café, structural modifications were made to enclose the 8,000-sq.-ft. outdoor dining area, install new automatic sliding doors and new aft entrances from the pool deck. The interior of the café is outfitted with all new ceilings, light fixtures, decorative valances, cherry laminates, wood sconces, bulkheads, buffet lines, Corian countertops with stainless steel trim, glass mosaic panels, carpet, and granite tile with mosaic inserts. The public restroom refurbishment includes a combination of 15 men's, women's and accessible restrooms that are being outfitted with new floor tile, base tile, granite and Corian vanities with colored glass inserts, decorative soffits, wallcoverings, stall partitions, and decorative mirror frames. In the Ship Shape Center, workers installed all new decorative tile, shower basins, liners and accessories in 8 shower stalls and new decorative vinyl tile in the treatment rooms. Prefabricated brass-framed light boxes were installed at each stair landing to display new decorative stencil art panels. James P. Colie has performed several interior renovation projects to Sovereign of the Seas since her delivery in 1988. In 1996 the company demolished and rebuilt the seven-store shopping mall, video arcade, and renovated 100 passenger cabins, two dining rooms, photo gallery, and performed miscellaneous SOLAS upgrades.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ClassNK Head Attends KOTC Delivery Ceremony

Noboru Ueda, Chairman and President of ClassNK attended the delivery ceremony for the M/T Al Yarmouk, constructed at Daewoo Shipbuilding & Marine Engineering Co.

Vard Orders Parat Electric Steam & Hot Water Boilers

During the last month, PARAT Halvorsen AS has collected four new boiler plant orders from the Vard Group and their multipurpose platform ships of Vard 1 08 design.

N-KOM Lays Keel for Qatar’s First Liftboat

Nakilat-Keppel Offshore & Marine (N-KOM) has achieved another milestone with the keel laying of its first liftboat newbuild project, awarded in July 2014 by long-time

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1323 sec (8 req/sec)