Joint Tanker Project Common Rules Draft Released

Thursday, June 24, 2004
The Joint Tanker Project (JTP) team of Lloyd’s Register, ABS and DNV has delivered draft common Rules for oil tankers, equal to or greater than 150 metres in length, to their technical committees, the wider industry and the International Association of Classification Societies for review and comment. We have provided the knowledge and the processes to enable shipowners and shipbuilders to implement the new Rules.

The objectives of JTP have been to improve the robustness and durability of oil tankers and to eliminate different approaches to scantling requirements. The new Rules are fundamentally different from the current Rule sets in several ways:

· transparency: there is now an explicit relationship between the applied loads and the structural capacity to withstand them to a satisfactory factor of safety

· net scantlings: the approach is based upon net thickness plus a corrosion margin. The net thickness is the material required to withstand the loads applied. The corrosion margin is the material required to withstand an average level of corrosion over the ship’s life

· explicit renewal thickness: a value, in millimetres, at which renewal must take place, is derived at the design stage

· direct calculations harmonised: an agreed common approach is adopted for each of the different necessary checks such as fatigue, buckling, finite element assessment and sloshing

· loads: there have been significant changes to the basis and application of the static and dynamic loads that are applied to the hull structure for deriving scantlings by both prescriptive and direct methods.

The schedule for the new Rules is as follows:

· end of June 2004 – new Rules distributed to the technical committees of the three societies and the rest of the industry for consultation

· January 1, 2005 – new definitive Rules published

· July 1, 2005 – new Rules become effective, superseding the current Rules.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Olympic Pact with Canyon Offshore

Norwegian offshore shipping company Olympic Shipping has entered into a frame agreement with Canyon Offshore for the joint marketing and subsequent operation of

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Wood Group Bags Statoil MSA

Wood Group has been awarded an evergreen master services agreement (MSA) by Statoil to support the life cycles of its offshore  and onshore facilities. Work and

Tanker Trends

TORM CFO Zacho Resigns

Mads Peter Zacho, Chief Financial Offer at TORM, has resigned to become Chief Executive Officer at J. Lauritzen A/S. Mads has been with TORM since 2013 and will

Alfa Laval PureNOx Prime Ordered for Five VLECs

Alfa Laval’s new PureNOx Prime solution for water treatment in Exhaust Gas Recirculation (EGR), will be part of EGR systems on five very large ethane carriers

NASSCO Delivers Second ECO Tanker to APT

On Thursday, May 19, shipbuilders at General Dynamics NASSCO delivered the Magnolia State to longtime customer American Petroleum Tankers (APT). The ECO Class tanker

 
 
Maritime Contracts Maritime Security Maritime Standards Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0795 sec (13 req/sec)