Juneau Moves Ahead with $50m Dock Plan

Wednesday, September 12, 2007
According to reports, Juneau leaders on continued to move forward with plans for a $50m cruise ship dock improvement plan that would allow two modern ships to dock at the same time by 2010. To do that, Port Director John Stone said some fees will increase dramatically.

The city's Docks and Harbors Board is proposing construction of a floating berth in front of the current cruise ship dock that would accommodate two big ships.

Use of the city dock now costs a ship 5.5 cents per ton to dock, but paying for the new improvements will boost that to 30 cents a ton. Other fees will change, however, including some going down. As an example, Stone said that means the new 1,868-passenger, 951-foot cruise ship Zuiderdam, which now costs $20,394 to dock in Juneau, would cost $28,233 in 2010. Source: Juneau Empire

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Wärtsilä Expects 5% Sales Growth

Wärtsilä announced its third quarter results, reporting that it sees good development in order intake and profitability. According to Wärtsilä, third quarter

Holland America Line & Seabourn names Kammerer is V.P

Mark Kammerer has been named vice president, international marketing and sales for Holland America Line and Seabourn. In this role, he will be responsible for the companies’ sales offices in the U.

Cruise Ship Returns to Texas after Ebola Concern

The Carnival Magic cruise ship was en route back to the United States on Saturday with a passenger from Texas who might have handled specimens of the first Ebola

Navy

Navy to Commission Submarine North Dakota

The Navy will commission its newest attack submarine North Dakota, during a ceremony Saturday, Oct. 25, 2014, at Submarine Base New London in Groton, Connecticut.

US Navy CNO: Photo of the Day

Chief of Naval Operations (CNO) Adm. Jonathan Greenert receives a system update brief in the combat information center aboard the Arleigh Burke-class guided-missile

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Pod Propulsion Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1011 sec (10 req/sec)