KCI Konecranes Wins Crane Contract

Thursday, December 08, 2005
KCI Konecranes has received an order for a Goliath Gantry Crane from Korean Daewoo Shipbuilding & Marine Engineering Co. The new 900-ton crane will be delivered to the Daewoo shipyard in Okpo in November 2006. The order value is approximately $18 million, and part of the construction work will be undertaken by the shipyard itself. The new Goliath crane will enable Daewoo to lift and turn ship blocks weighing up to 800 tons. The crane is equipped with two 450-ton hooks and one 500-ton hook. It stands 100 m high, spans over 148 m and employs 64 wheels to travel down a 500 m runway.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

French PM: Aussie Subs to be built in Australia

French Prime Minister Manuel Valls said on Monday he was committed to building all of a new Australian submarine fleet in Australia, apparently contradicting the

Asia-N.Europe Box Rates Jump 170 pct

Shipping freight rates for transporting containers from ports in Asia to Northern Europe jumped 170 percent to $732 per 20-foot container (TEU) in the week ended on Friday,

NAT Acquires Four 150,000dwt Tankers

Nordic American Tankers Limited ("NAT" or the "Company") announced today that it has entered into an agreement to acquire four existing Suezmax sister vessels built in Japan at a world-class shipyard.

Shipbuilding

GE Gas Turbines for Japan's New Warship

GE's Marine Solutions announced it will provide IHI, Tokyo, Japan, with two LM2500 aeroderivative marine gas turbines for the Japan Maritime Self Defense Force's (JMSDF) new 8,

US Tests World's Largest Unmanned Sub Hunter

The US military is beginning testing on the world's largest unmanned ship - a self-driving 40-metre vessel designed to travel thousands of kilometres out at sea without a single crew member on board.

Partners Tap Standardization to Trim Newbuild Costs

Unfamiliar specifications and processes often result in rework, delays and misunderstandings, and are adding thousands of engineering hours to the design and construction

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0741 sec (13 req/sec)