Keppel, First DSS 38 Semisubmersible for Brazil

Sunday, August 30, 2009
Photo courtesy Keppel FELS

Keppel FELS Limited is on track to deliver Gold Star, the first of two DSS 38 deepwater rigs to Brazilian operator, Queiroz Galvão Óleo e Gás (QGOG) later this year.

Progressing on time and within budget, Gold Star will be the first DSS 38 rig to enter the market and support Petrobras's exploration and production activities.

Gold Star was named today by Lady Sponsor, Mrs Fiona Steane, spouse of Mr Christopher Steane, Global Head for Structured Finance of the rig’s financiers, ING Bank.

The design is jointly developed and owned by Keppel’s Deepwater Technology Group and Marine Structure Consultants. DSS 38 is a compact and cost-effective deepwater rig designed to meet operational requirements in the deepwater "Golden Triangle" region, comprising Brazil, Africa and the Gulf of Mexico.

In the league of some of the world’s most advanced semisubmersibles, DSS Series rigs are designed to maximize uptime with reduced emissions and discharges.

DSS 38, the latest model in this Series, is rated to drill depths of 30,000 feet below mud line in over 9,000 feet water depth. It has an operational displacement of over 38,000 tonnes and can accommodate 130 men. It also features both vertical and horizontal riser storage and is configured with eight 3000kW azimuth thrusters to keep the rig in position.

Presently under construction at Keppel FELS, QGOG’s second DSS 38 unit, Alpha Star, is scheduled for delivery in mid-2011.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

US Oil Platform on Fire in Gulf Of Mexico

An oil platform caught fire and was evacuated in the U.S. Gulf of Mexico offshore Louisiana in the early hours of Friday, though no injuries were reported, the U.

IMO Adopts Polar Code Environmental Provisions

United Nations' International Maritime Organization (IMO) has adopted the environmental part of the Polar Code. Hereby, internationally binding regulations on

Two Hurt in Petrobras Platform Accident; Output Halted

Brazil's state-led oil company Petrobras was forced to stop output at its P-56 offshore oil production ship on Wednesday in the Marlim Sul field after an explosion

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1613 sec (6 req/sec)