Kvaerner Masa-Yards Receives Contract

Monday, February 11, 2002
Kvaerner Masa Marine (KMM) and Masa-Yards Arctic Technology Center (MARC), both part of the Kvaerner Masa-Yards Group, were recently awarded a contract to provide ice breaking consulting services and model testing for the USCG Great Lakes Icebreaker currently being designed by Marinette Marine Corporation (MMC) a division of Manitowoc Marine Group. The new icebreaker will be named Mackinaw in honor of the heavy icebreaker that it is replacing. The new Mackinaw will be a multi-mission vessel, approximately 73 m long, 18.3 m beam, and displacing 3,500 tonnes. The ship will break ice to keep the Great Lakes shipping lanes open in the winter and service aids to navigation in summer. As well, the vessel will perform search and rescue, pollution control, security and law enforcement. The vessel employs azimuthing podded electric drives, which were pioneered by Kvaerner Masa-Yards in conjunction with ABB Industry Oy.

The icebreaking consulting services to be provided to MMC will include a hull form feasibility study, and ice performance, powering, stability, seakeeping and maneuvering performance evaluations. One of the hull forms to be studied will be the Double Acting Concept patented by Kvaerner Masa-Yards. MARC will also be carrying out an extensive ice model test program at their model ice tank in Helsinki and KMM will supervise the open water model tests to be carried out at SSPA in Sweden.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

BHP Billiton Focus on Operation & Productivity

* BHP Billiton is now targeting US$4 billion of annualised productivity gains in its core portfolio by the end of the 2017 financial year, a US$500 million increase on previous guidance.

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1086 sec (9 req/sec)