LCS Construction Commences

Tuesday, February 08, 2005

U.S. Navy officials and members of the Lockheed Martin LCS team observe the first steel cut that marks the construction start of the lead LCS at Marinette Marine in Marinette, WI. LCS will provide the U.S. Navy with transformational capabilities in the littorals with an agile, highly-maneuverable monohull design.

The Lockheed Martin team cut steel for the nation’s first Littoral Combat Ship (LCS) early this month, marking the start of fabrication at Marinette Marine in Marinette. The team will deliver the first LCS to the U.S. Navy in late 2006. The team was authorized to move to the construction phase after passing a Production Readiness Review on Jan. 14, demonstrating the team’s readiness to begin construction, based on design detail, personnel and material. During the review, the team also demonstrated an integrated program management approach to ensure a seamless transition from design to construction for on-time and on-budget delivery.

The Lockheed Martin team design, a proven semi-planing steel monohull, provides outstanding agility and high-speed maneuverability with known seakeeping characteristics to support launch and recovery operations, mission execution and optimum crew comfort. The Lockheed Martin-led team includes naval architect Gibbs & Cox, ship builders Marinette Marine, a subsidiary of The Manitowoc Company, Inc., and Bollinger Shipyards, as well as best-of-industry domestic and international teammates to provide a low-risk, affordable LCS solution.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Mount Whitney Departs Batumi, Georgia

The U.S. 6th Fleet command and control ship USS Mount Whitney (LCC 20) departed Batumi, Georgia, Oct. 18 after completing a successful port visit. While in Batumi,

USS Constitution Not to Set Sail Until 2018

The crew of USS Constitution embarked on their final Boston Harbor underway demonstration aboard Old Ironsides this year, Oct. 17. Constitution set out into

US Navy to Christen Littoral Combat Ship Detroit

The Navy will christen littoral combat ship (LCS) Detroit, on Oct. 18 during a ceremony at Marinette Marine Corporation shipyard in Marinette, Wisconsin. Secretary of the Navy Ray Mabus,

Container Ships

Long Beach Port Adds ‘Free Time’ for Cargo to Ease Congestion

The Port of Long Beach will add an extra three days to the time that overseas import containers can remain on the docks without charge, in order to grant some

Long Beach Officials on Trade Mission in Asia

Meeting with shipping lines to build business for Port of Long Beach Long Beach Mayor Robert Garcia, Harbor Commissioners and senior Harbor Department staff

Largest Ever Ship on the Thames

The largest ship ever to enter the Thames is due to call at the U.K.’s new deepwater container port DP World London Gateway this weekend weekend, with estimated

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Pipelines Pod Propulsion Salvage Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1445 sec (7 req/sec)