Litton Avondale Holds Keel Laying

Wednesday, August 30, 2000
Litton Avondale Industries laid the keel of M/V Polar Discovery on August 28 for Long Beach, Calif.-based Polar Discovery. Formally known as Arco Tankers, the company contracted Avondale to build this vessel, which is the last part to a three-part series of Millennium Class tankers that will transport crude oil from Alaska to the U.S. West Coast.

The tanker, which is scheduled for delivery in the fourth quarter 2002, is the final chapter in this Millennium series that began with Polar Endeavour and Polar Resolution. Both vessels will enter the Alaskan trade upon their delivery in 2001. Measuring 895 x 152 x 86 ft. (272.6 x 46.2 x 26.3 m), the vessels' namesake is in honor of explorer Captain James Cook. They are the premiere crude-oil carriers built for Alaskan trade in accordance with the Oil Pollution Act of 1990. Constructed with double hulls, the tankers will boast double independent engine rooms, twin propellers and twin rudders. In addition, the tankers will hold all cargo, fuel and lubricating oils isolated from the ship's side by ballast tanks or void spaces.

The tanker trio will be powered by twin 11,060 kW slow-speed diesel engines employing a 2,206 kW bowthruster at a design speed of 16.5 knots loaded and 17.5 knots in ballast. Polar Discovery's tanks will house more than one million barrels of cargo at full capacity and 125,000-dwt of cargo for Puget Sound, Wash.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Bay Shipbuilding Delivers ATB to Moran

Fincantieri Marine Group’s Fincantieri Bay Shipbuilding (FBS) has delivered the Articulated Tug Barge unit (ATB) Barbara Carol Ann Moran and the 110,000-barrel

Conrad Shipyard Christens Woods Hole Ferry

M/V Woods Hole, a 235-foot long passenger ferry built for the Steamship Authority of Woods Hole, Mass., was christened on May 20 at Conrad Aluminum in Amelia, La.

Tech & Design Solutions for Modern Workboats

EPA Tier 4 regulations (for engines of 804 hp and higher) and propulsion advancements have many manufacturers and vessel designers changing course to adapt to new requirements and customer demands.

Tanker Trends

EGAS: Egypt to tender for 10 LNG Cargoes

Egypt will tender next week to import 10 cargoes of liquefied natural gas (LNG) for delivery in July and August, an official from the state gas company, EGAS, said on Thursday.

Fos Tanker Queue Grows as Strike Impacts Refinery Ops

Nearly two dozen vessels were queued outside the French oil import terminal in Fos, southern France on Thursday, held up by a strike organised by the hardline CGT

Statoil Says Sees European Gas Prices Bottoming Out

Norway's Statoil does not expect European gas prices to fall much further as rising demand from the power generation sector would offset an expected increase in liquefied natural gas (LNG) supply,

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0791 sec (13 req/sec)