LNG Project Costs Rise 21%

Thursday, September 07, 2006
Woodside Petroleum Ltd said costs for the planned phase five expansion of its North-West Gas liquefied natural gas project are estimated to have risen by 21 pct to 2.42 bln aud because of higher labor charges. The company, 34 % owned by the Royal Dutch Shell group, said the spike in costs is largely due to a sharp rise, internationally, in labor charges in the construction industry. Woodside operates the project and is a one sixth owner alongside Royal Dutch Shell.

Already more than 14 bln aud has been spent on the LNG project's development over a 20-year period, making it a major LNG project by world standards. The fifth phase expansion includes the construction of an LNG processing facility with annual capacity of 4.2 mln metric tons of liquefied gas for export, largely to Asian markets.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Smart-Ship 'Quantum of the Seas' Readies

Tech-savvy modern travelers will be wowed by Royal Caribbean International's newest ship, 'Quantum of the Seas', which incorporates unprecedented levels of technology

Queensland Turns Down Cruise Terminal Request

Australia's Queensland government has backed away from controversial plans to allow a cruise ship terminal to be built on state-owned land on the Gold Coast, according to the 'Brisbane Times'.

Propulsion Woes Bring Queen Victoria to Early Refit

Cunard’s Queen Victoria to undergo multimillion dollar refit at Blohm & Voss Shipyard in January 2015, nearly one year ahead of its planned December 2015 maintenance.

LNG

Pskov Gas Carrier Construction Nears Completion

On August 25, 2014, the naming ceremony for the Pskov high-tech liquefied natural gas (LNG) carrier was held at the South Korean shipyard STX Offshore & Shipbuilding.

MN 100: Crowley

9487 Regency Square Boulevard Jacksonville, FL 32225 Tel: (800) 276-9539 Email: corpcomm@crowley.com  Website: www.crowley.com Chairman & CEO: Thomas B.

Kogas Talks to Offload up to 10 Autumn LNG Cargoes

Korea Gas Corp. has approached long-term suppliers of liquefied natural gas (LNG) to defer up to 10 autumn cargos to winter, showing it is lumbered with excess supply and pulling out of spot markets,

 
 
Maritime Security Maritime Standards Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0898 sec (11 req/sec)