LNG Project Costs Rise 21%

Thursday, September 07, 2006
Woodside Petroleum Ltd said costs for the planned phase five expansion of its North-West Gas liquefied natural gas project are estimated to have risen by 21 pct to 2.42 bln aud because of higher labor charges. The company, 34 % owned by the Royal Dutch Shell group, said the spike in costs is largely due to a sharp rise, internationally, in labor charges in the construction industry. Woodside operates the project and is a one sixth owner alongside Royal Dutch Shell.

Already more than 14 bln aud has been spent on the LNG project's development over a 20-year period, making it a major LNG project by world standards. The fifth phase expansion includes the construction of an LNG processing facility with annual capacity of 4.2 mln metric tons of liquefied gas for export, largely to Asian markets.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Cruise Ship Returns to Texas after Ebola Concern

The Carnival Magic cruise ship was en route back to the United States on Saturday with a passenger from Texas who might have handled specimens of the first Ebola

Kiel's 2014 Cruise Shipping Season Ends

Expanded terminal capacities created at Berth 1 This year’s cruise shipping season in Kiel closes on the evening of October 18 when the AIDAcara sets sail for the Canary Islands.

Cruise Ship Passenger Isolated Due to Ebola Risk

A Texas hospital employee who may have handled lab specimens from an Ebola victim has entered voluntary isolation on board a Carnival cruise ship in the Caribbean.

LNG

Weak Oil Threatens US Export of LNG

Plunging global oil prices may turn hopes for cheap liquefied natural gas supplies from the United States into a costly disappointment for Asian buyers who have

Singapore’s MPA Discuss LNG Bunkering

The Maritime and Port Authority of Singapore (MPA), Antwerp Port Authority, Port of Rotterdam and Port of Zeebrugge participated in a Liquefied Natural Gas (LNG)

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4931 sec (2 req/sec)