LNG Ship Sails off Shipyard

Thursday, December 29, 2005
According to Xinhua, China's first liquefied natural gas(LNG) ship sailed off shipyard Wednesday in Shanghai, marking China's shipbuilding industry stepping into a new era. Sources from the China State Shipbuilding Corp (CSSC) said the LNG ship was built by CSSC's Shanghai subsidiary, the Hudong-Zhonghua shipbuilding (Group) Co Ltd, which fills a blank in China's shipbuilding history. The LNG ship is regarded a high-tech product with high-added value in the shipbuilding industry, which can only be built in Japan, the Republic of Korea and several European countries. To share a cake of the global market, China input more than 100million yuan on the research of the LNG ship in the past years andmake effective its first contract for LNG vessels in August, 2004. The first LNG ship, 292 meters long and 43.35 wide, with a capacity of 147,200 cubic meters, is scheduled to go into operation in October, 2007, said the Hudong-Zhonghua shipbuilding (Group) Co. Ltd. The subsidiary group now shares an order of five LNG vessels, with the second expected to be delivered at early 2008. The costs of the two LNG vessels hit 400 million U.S. dollars, said the group.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Environmental

Singapore, Malaysia Conduct Joint Chemical Spill Drill

The Maritime and Port Authority of Singapore (MPA) and the Marine Department of Malaysia (MDM) conducted a joint chemical spill exercise at sea along the East

Insights: Kunkel Weighs in on Propulsion Technology

LNG? Methanol as fuel? Hybrid systems? Tier 4? Reducing noise? Cutting emissions without crushing fuel economy? Marine News readers have questions and Bob Kunkel has answers.

Safety and Preparation on the Brownwater Radar

Weather Channel Forecasters are predicting a “near-average” hurricane season for 2016, but warn that an average season does not mean businesses and residents shouldn’t prepare for the worst.

LNG

First US LNG Shipment Goes to China

The first liquefied natural gas vessel from the lower 48 U.S. states is on its way to China, according to a Reuters interactive map on Friday, the latest sign that

LNG Market Needs More Vessels than Currently on Order

Despite the current weakness in LNG shipping rates, Drewry maintains its bullish long-term outlook for LNG shipping and believes that the market will require more

Insights: Kunkel Weighs in on Propulsion Technology

LNG? Methanol as fuel? Hybrid systems? Tier 4? Reducing noise? Cutting emissions without crushing fuel economy? Marine News readers have questions and Bob Kunkel has answers.

 
 
Maritime Careers / Shipboard Positions Maritime Security Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0682 sec (15 req/sec)