LNG Ship Sails off Shipyard

Thursday, December 29, 2005
According to Xinhua, China's first liquefied natural gas(LNG) ship sailed off shipyard Wednesday in Shanghai, marking China's shipbuilding industry stepping into a new era. Sources from the China State Shipbuilding Corp (CSSC) said the LNG ship was built by CSSC's Shanghai subsidiary, the Hudong-Zhonghua shipbuilding (Group) Co Ltd, which fills a blank in China's shipbuilding history. The LNG ship is regarded a high-tech product with high-added value in the shipbuilding industry, which can only be built in Japan, the Republic of Korea and several European countries. To share a cake of the global market, China input more than 100million yuan on the research of the LNG ship in the past years andmake effective its first contract for LNG vessels in August, 2004. The first LNG ship, 292 meters long and 43.35 wide, with a capacity of 147,200 cubic meters, is scheduled to go into operation in October, 2007, said the Hudong-Zhonghua shipbuilding (Group) Co. Ltd. The subsidiary group now shares an order of five LNG vessels, with the second expected to be delivered at early 2008. The costs of the two LNG vessels hit 400 million U.S. dollars, said the group.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Environmental

Long Beach Cargo Operations Resume

Repair work begins after storm surges subsides The Port of Long Beach resumed full cargo-handling operations Thursday, Aug. 28, after a lessening of storm surges

Restoring the NY-NJ Harbor Estuary

Significant challenges often require a team effort. Restoring the New York-New Jersey Harbor Estuary is one of them. A group of professionals from the Army Corps of Engineers,

GPS Discharge Control System for Food Waste

Through a cooperation with Marine Position AB, Uson Marine AB can now offer functionality from the Seatrade award winning system Environmental Navigator for its

LNG

Policy Uncertainty Threatens to Slow Renewable Energy Momentum

IEA forecast sees renewable power as a cost-competitive option in an increasing number of cases, but facing growing risks to deployment over the medium term. The

SHIPPINGInsight Extends Early-bird Registration

SHIPPINGInsight 2014 is extending the deadline for early-bird registration to Sept. 15. Attendees registering online at www.shippinginsight.com/choose-event prior to midnight Sept.

LNG Finalizes Acquisition of Bear Head LNG Project

Liquefied Natural Gas Limited today informed having finalised the acquisition of 100% of Bear Head LNG Corporation (BHLC). This follows the announcement

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1379 sec (7 req/sec)