Location is determined at time of injury

Thursday, September 23, 2004
The U.S. Court of Appeals for the Fifth Circuit ruled that, in a case brought under the Longshore and Harbor Workers’ Compensation Act (LHWCA), the status of the location where the injury was incurred is determined at the time of the injury. In the instant case, plaintiff welder was injured while on a construction project. Two barge slips were being built. The injury was incurred on the land side of the project, before the remaining earthwork had been removed to allow water to enter. The court held that, since the site where the injury was incurred was not serving and had not served a maritime purpose, the LHWCA did not apply. Tarver v. Bo-Mac Contractors, Inc., No. 03-61028 (5th Cir. - HK Law)
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Yara Reports Strong 3Q Results

Yara International ASA delivered strong third-quarter results, with record fertilizer deliveries and continued margin benefit from lower European gas price. "Yara

Bright Outlook for BWM Convention

The Danish Maritime Authority informed that the Ballast Water Management Convention is now one step closer to ratification following last week’s meeting of United

Court Dismisses Boating Industry’s Challenge to EPA Misfueling Rule

The National Marine Manufacturers Association (NMMA) said it is disappointed with the U.S. Court of Appeals decision released on Tuesday, October 21, 2014 for the D.

Tanker Trends

FMT Orders Another Towboat from Eastern Shipbuilding

Eastern Shipbuilding Group, Inc. is pleased to announce that Florida Marine Transporters, Inc. of Mandeville, LA exercised another additional 90’x32’x10’ “Canal

ClassNK Completes Work on KOTC Vessel

ClassNK announced that it has completed work on the 31,445GT Product Tanker MUTRIBA, built by Hyundai Mipo Dockyard Co., Ltd. (HMD) as part of a series of vessels

PDVSA Charters Another Algerian Crude Cargo

Venezuela's state-run oil company PDVSA has hired a supertanker to load a second 2 million-barrel cargo of Algerian crude, according to preliminary tanker fixture data.

 
 
Maritime Careers / Shipboard Positions Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1239 sec (8 req/sec)