Lower Willamette River Dredged Material Management Plan

Friday, October 27, 2006
The US Army Corps of Engineers issued a notice stating that it intends to prepare an environmental impact statement for the Lower Willamette River dredged material management plan. The notice states that comments on this proposed project should be submitted by November 27, 2006. 71 Fed. Reg. 63005 source: HK Law

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Optimarin Breaks into the Fishing Market

Ballast water treatment (BWT) specialist Optimarin has landed its first ever contract in the fishing segment. The Norwegian firm will now supply its soon to be

ALMACO Wins Statoil Order for 450 Cabins

ALMACO Group was awarded the contract to build 450 NORSOK-compliant Modular Cabins for Statoil’s Johan Sverdrup fixed platform at Apply Leirvik’s yard in Stord, Norway.

Norway will be Lithuania's 2016 Top Gas Supplier

Lithuania will import more gas from Norway than from former sole supplier Russia in 2016 after developing infrastructure to support liquefied natural gas (LNG) imports,

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0682 sec (15 req/sec)