Major Overhaul Planned For Kenya's Mombasa Port

Friday, October 15, 1999
Kenya's ailing Mombasa port will undergo a radical overhaul to ensure its status as the shipping hub of East Africa, the new managing director of Kenya Ports Authority (KPA) said. Joseph Munene said he was aware that he had been given one of the toughest jobs in the country -- turning around a port almost destroyed by corruption and inefficiency. "My biggest challenge is to make the port profitable and to improve cash flows," he said. "There are immediate action plans we intend to take based on logistics and systems improvement in terms of performance." The appointment of Munene and new KPA chairman Jonathan Mturi, part of a private sector team drafted in to take over Kenya's parastatals by civil service head Richard Leakey, was welcomed by Kenyan industry. "These are good people from a commercial background with years of experience behind them," Chairman of the Kenyan Association of Manufacturers Chris Kirubi said. "The port can be retrieved, it is just a question of determination." But some KPA insiders believe Munene will need more than determination in his rescue plan. With the port's liabilities thought to run into billions of Kenya shillings they say he needs a miracle. "If this was a private company it would be in liquidation by now," a highly placed source in the KPA said. "We are basically insolvent." Drive To Slash Clearance Times Among Munene's first ambitions is to fight off competition from the rival port at Dar es Salaam in neighboring Tanzania by drastically cutting cargo off-loading and clearance times, a move that would give a much needed boost to Kenya's struggling industrial sector. "It is a big issue if someone can get goods from Dar es Salaam to Kampala in 10 days, and we are taking 28," Munene said. "Experiments show it can be done in six days. Six would be our ultimate target, although we will aim for 10 at first." Achieving that goal will also depend on improvements in Kenya's crumbling rail and road networks. To stay ahead of Dar es Salaam, Munene said he will also have to cut crippling maintenance expenditure by investing in new equipment, something that will be easier said than done given the port's lack of money. "None of our machinery has been replaced in over 20 years, and superstructure is very dilapidated," he said. "If we had excess cash we would by new equipment now, but we don't." The lack of funds also means essential staff layoffs will have to be delayed, but Munene believes he can increase cash flows by reducing bogus trading partners who have taken a lot out of the port but put very little in. "There are too many goods suppliers who are not genuine and I am going to cut that out," he said. "We should restrict ourselves to a maximum of 15 suppliers in each category." Port officials estimate that there are now well over 1,000 suppliers in 16 categories.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

Port Metro Vancouver Approves $15m Coal Transfer Project

Port Metro Vancouver, Canada's largest port, said on Thursday it has approved a new facility to transfer coal from trains onto barges at Fraser Surrey Docks, a

Evergreen Line Makes Maiden Call to Boston

Evergreen Line’s ItalLunare celebrated its maiden call to the Port of Boston with an official first call and plaque presentation on Wednesday, the Massachusetts Port Authority (Massport) announced.

Second Tanker Waits to Load Oil at Libya's Reopened Port

A second tanker is waiting to load oil at Libya's Es Sider port, state-run National Oil Corp (NOC) said on Thursday, as the country's biggest crude export terminal

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Port Authority Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1059 sec (9 req/sec)