MAN B&W to Power LNG Carriers

Thursday, April 20, 2006
The Shipping Requisition Team has confirmed orders for six Q-max LNG carriers. Each vessel will be powered by two MAN B&W Diesel 7S70ME-C electronically controlled two-stroke low speed diesel engines. These vessels will be the world’s largest LNG carriers, each able to transport 265,000 m3 of LNG. The vessel will operate with a reliquefaction plant for operation of boil off gas to the cargo tanks. All 12 MAN B&W Diesel 7S70ME-C engines will be built by the Doosan Engine Co. Ltd. (Korea). Each main engine is rated at 21,770 kW at 91 rpm. Each vessel will also be fitted with four MAN B&W Diesel 9L32/40 Holeby GenSets. The 24 gensets will be built by the STX Corporation (Korea). Including projected vessels, six Q-max and four Q-Flex, this order brings the total number of identified vessels up to 36 for LNG carriers with MAN B&W Diesel two-stroke engines operating on HFO in conjunction with reliquefaction plants. In total, 72 MAN B&W Diesel S70ME-C engines with 6 or 7 cylinders are now on order or delivered for installation in LNG carriers. Qatargas II is a joint venture between Qatar Petroleum (70%) and ExxonMobil (30%). The engines of choice for LNG carriers are either 6 or 7 cylinder versions of the MAN B&W Diesel two-stroke, electronically controlled S70ME-C. These engines are used in a variety of applications where flexibility and reliability are essential for uninterupted vessel operation.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Coast Guard

Grounded Bulker Repaired, Heads for Japan

The Captain of the Port for Oregon and southern Washington canceled the captain of the port order on the motor vessel Sparna allowing the vessel to leave its mooring at Kalama, Wash.

Towing Vessel Inspection Bureau Elects New Leaders

Towing Vessel Inspection Bureau Holds Annual Membership Meeting; Elects New Leadership and Votes to Proceed with a Third Party Organization Application to the Coast

Bulker Loses Propulsion off California

The U.S. Coast Guard is monitoring a 587-foot bulk carrier Ultra Lascar after the ship lost propulsion at 10:20 a.m., approximately five miles offshore from Daly City, Calif.

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0941 sec (11 req/sec)