Man-Made Island Proposed for LNG Terminal

Friday, August 17, 2007
Atlantic Sea Island Group, announced that they have received notification from the United States Coast Guard that their application to create an LNG deepwater terminal on a 60.5 acres constructed island 13.5 approximate miles south of Long Beach, Long Island, has been deemed "complete" and allows the regulatory, oversight and review process to continue pursuant to federal regulations. Far from population centers and outside of vital shipping lanes, Safe Harbor Energy will have the capacity to deliver 2 billion cubic feet of natural gas each day to 65 million consumers, ending the area's dependence on natural gas shipped up from the Gulf Coast some 1,200 miles away.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

MN 100: Brunswick Commercial and Government Products

420 Megan Z. Ave Edgewater, FL 32132 Telephone: 386 423 2934 E-mail: kelsey.nemeth@whaler.com Website: www.brunswickcgp.com CEO/President: Huw Bower Number

MN 100: BAE Systems Ship Repair

750 W. Berkley Avenue Norfolk, VA 23523 Tel: (757) 494-4674  Email: john.measell@baesystems.com Website: www.baesystems.com/shiprepair President: William Clifford The Company: BAE Systems,

Signet Tows Aircraft Carrier on Final Voyage

The final voyage of aircraft carrier USS Saratoga begins today. From the Eastern Hemisphere to the Western Hemisphere, the USS Saratoga has made her mark around the globe,

LNG

Banking on US Shale Gas Boom, Asia Petrochemical Firms Switch to LPG

Asia petrochemicals firms are building tanks and retooling plants to store and process liquefied petroleum gas imported from the United States, counting on a flood

Mozambique: $30b Invested for 2018 LNG Export

More than $30 billion will be invested initially in Mozambique's natural gas sector to build capacity to produce 20 million tonnes per year of liquefied natural gas (LNG),

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0944 sec (11 req/sec)