Manitowac to Build Coast Guard Response Boats

Tuesday, May 06, 2003
The Coast Guard has selected the Manitowoc Group to build one of three Response Boat -- Medium (RB-M) test boats. These boats are the first of a class of vessels that will replace the Coast Guard's aging fleet of 41-foot Utility Boats, which have been the workhorse of coastal stations for the past 25 years. The Coast Guard is pursuing the RB-M project using a two-phase competitive process. Three vendors were selected based on their written proposals to produce a test boat of their design. Coast Guard personnel will test each of these boats and the three vendors will subsequently bid for a full-production contract consisting of approximately 180 RB-Ms. Delivery of each $2.5-million test boat is expected in November or early December 2003, with production of the replacement fleet spanning a six-year period. "We are excited to be selected for this phase of the Response Boat -- Medium project," said Terry D. Growcock, Manitowoc's chairman and chief executive officer. "This project is one of the many opportunities we referred to in our first-quarter earnings release in April and presents us with another tremendous opportunity to serve the Coast Guard's needs beyond our current buoy tender and icebreaker projects," he explained. The Response Boat -- Medium will perform many missions typically performed by the Coast Guard's small boat fleet, including homeland security and search and rescue operations. The new boats will have greater maneuverability than the existing Utility Boats and will be capable of speeds of more than 40 knots (46 mph). The boats will be equipped with a state-of-the-art navigation system, heating and air conditioning, and a communication system prescribed by the Rescue 21 project for coordinated Coast Guard missions. The system is capable of communicating with other federal, state, and local homeland security partners.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

DP World Receives 1st Scheduled Vessel at New Terminal

DP World has yesterday welcomed the first scheduled vessel to call at its new Container Terminal 3 in Jebel Ali, Dubai, as it gears up to serve customers at the state-of-the-art facility.

Kalmar 5th Generation Gloria Reachstackers Enter US

Kalmar, part of Cargotec, is launching its highly acclaimed range of reachstackers, called Gloria into the Americas. The eagerly awaited launch follows the successful

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Port Authority Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2958 sec (3 req/sec)