Manitowoc Selected to Build Navy Lighterage System (INLS)

Wednesday, August 13, 2003
The Manitowoc Company, Inc. and its subsidiary, Marinette Marine Corporation, part of the Manitowoc Marine Group, have been awarded a $40.5 million contract by the Naval Facilities Engineering Command, Department of the U.S. Navy, to build the Improved Navy Lighterage System (INLS). The contract contains additional fixed options that can be exercised over the next five years for a maximum amount of $404.8 million. As part of the initial contract, Marinette Marine will build 29 barges that can be assembled into floating platforms or causeway systems to transport heavy materials such as tanks, trucks, and cargo between ship and shore. Each barge will be approximately 80 ft. by 24 ft., will weigh between 75 and 124 tons, and will be capable of carrying approximately 150 tons of cargo. Six of the 29 barges will be powered by 360-degree rotating water-jet thrusters for propulsion and station-keeping. "We are pleased to have been selected by the U.S. Navy for this important system," said Dennis McCloskey, president of Manitowoc's Marine Group. "This contract comes on the heels of our selection as a finalist in the Navy's Littoral Combat Ship project with our partners Lockheed-Martin, Gibbs & Cox, and Bollinger Shipyards, as well as our recent selection by the U.S. Coast Guard as one of three companies to build a Response Boat Medium prototype with our partner, Kvichak Marine of Seattle. We look forward to strengthening our relationship with our valued government customers."
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

MAN GenSets for Chilean Fishing Vessel

MAN Diesel & Turbo received an order for three MAN 6L21/31 gensets to power a wellboat newbuilding for Patagonia Wellboat, the Chilean fish-farming operator. The

Zentech to Perform ZAIMS Work on Brazilian Aircraft Carrier

Zentech’s President Ramesh Maini announced that the company has been awarded a contract to perform an inspection and evaluation of the hull steel for the Naval Aircraft Carrier São Paulo,

LNG Tanker Due in UK Around May 6

Britain's Isle of Grain liquefied natural gas (LNG) import terminal is set to receive the GDF Suez Point Fortin tanker on around May 6, live ship-tracking data on Reuters Eikon shows.

Ports

USCG Monitors LNG Carrier Repair in Alaska

The U.S. Coast Guard (USCG) is monitoring repairs aboard the liquid natural gas (LNG) carrier Excel in Homer, Alaska.    The vessel was received an order from

Port of Seattle’s Cruise Season Underway

The Port of Seattle’s 2015 cruise season began May 1 at Smith Cove Cruise Terminal with the arrival of the Holland America Line Westerdam. The port expects 192 cruise ship calls this season,

Maersk Meets Iranian Officials over Seized Vessel

Maersk Line said on Monday it had met again with the Ports & Maritime Organization (PMO) in Iran regarding the seizure of the vessel Maersk Tigris but has yet to

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1247 sec (8 req/sec)