MarAd Oks Plan For Mass. Bay LNG Terminal

Thursday, February 01, 2007
Suez Energy North America announced MarAd has agreed to issue a deep water port license for its Neptune offshore liquefied natural gas terminal planned for Massachusetts Bay. The license will be issued after the Neptune project, planned in federal waters about 7 miles south-southeast of Gloucester, receives environmental permits from the Army Corps of Engineers as well as water and air discharge permits from the Environmental Protection Agency. The proposed project must also get two key state environmental permits. That could be done by the middle of this year, a spokeswoman for Suez Energy, which also is the parent company of an onshore LNG terminal in Everett. The federal approval comes a month after former Gov. Mitt Romney endorsed plans to build two offshore gas terminals, including the Neptune project, to help meet a growing regional demand for energy in New England. The other project, Northeast Gateway, is proposed by Excelerate Energy LLC, about 13 miles offshore in the same area. Some fishing industry leaders have opposed the terminals, saying construction of the pipeline would disturb fish habitats and force more fishing ground closures in areas invaluable to Gloucester's fishermen. The companies say they will minimize risks to the public by eliminating the need to ferry the potentially hazardous gas through Boston Harbor, and eliminating the need for onshore storage tankers since the gas will be pumped out of the seagoing tankers and into the grid. Source: AP
Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

EXMAR Orders Second FLNG from Wison

EXMAR NV has placed an order for a second Floating LNG Liquefaction Unit (FLNG) at Wison Offshore & Marine. Under the agreement, Wison will be responsible for the turnkey engineering,

Wärtsilä to Power LNG-fuelled RoPax Ferry

A new passenger ferry being built for Swedish operator Rederi AB Gotland will be fuelled by liquefied natural gas (LNG) and will feature a Wärtsilä integrated solution.

US Fleet to Pump $75m into Great Lakes Shipyards

U.S.-flag Great Lakes vessel operators plan to spend $75 million this winter to ready the fleet for the 2015 shipping season, the Lake Carriers’ Association (LCA) reported.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1551 sec (6 req/sec)