Metal Trades Builds Hull for Barge Conversion

Tuesday, September 29, 2009
File Photo courtesy Metal Trades, Inc.
Photo courtesy Metal Trades, Inc.

Metal Trades, Inc. (Hollywood, SC) has built and delivered the outer hull for a double hull fuel barge conversion for Cross State Towing Company of Jacksonville, FL. The 256 ft long by 56 ft wide outer hull was designed by Glowacki Engineering to retrofit on the outside of the 17,000 BBL cargo tank bay in compliance with USCG and OPA 90 requirements.

According to Randy Brown, Vice President of Business Development for Metal Trades, “This was an interesting project that involved building and launching only the outer hull, requiring us to take extra precautions for launching because, without a deck or inner hull in the cargo tank bay, the barge outer hull did not have very much longitudinal stiffness. We had Saber Design and Analysis Services perform Finite Element Analysis (FEA) of the hull to verify transfer car placement and temporary bracing while ensuring that peak stresses remained low in the hull during transfer and launch.”

Charleston Heavy Lift, Inc. was contracted to perform the final lifting and setting of the 353 ton inner hull cargo bay within calm waters of the intra-coastal waterway close to shore. The lift was completed as planned within a few hours. The final welding of the inner hull to the outer hull was completed by Cross State Towing at its own shipyard in Jacksonville, Fla.

(www.metaltrades.com)

Email AddThis Feed Button Share
Maritime Reporter May 2012 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Fairstar Heavy Transport Takes Fleet Finance Loan

Fairstar Heavy Transport signs USD 247 million fleet finance facility with a Dutch banking syndicate led by ING Bank, mainly for Chinese liftboat newbuilds Fairstar Heavy Transport N.

Russia Floats Out Large Landing Warship

The Yantar shipyard in the Russian exclave of Kaliningrad has floated a new large landing ship for the Russian Navy The $160-million vessel has a displacement of about 6,

St. Johns Ship Building Delivers Sea Strength

St. Johns Ship Building of Palatka, Fla. delivered the offshore service vessel (OSV) Sea Strength to A. R. Singh Contractors of Point Fortin, Trinidad.  The

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Port Authority Salvage Ship Repair Ship Simulators
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright

Time taken: 0.0812 sec (12 req/sec)