MITAGS Installs Latest Generation LNG Cargo Simulator

Wednesday, December 12, 2007
MITAGS has installed the latest generation Kongsberg LNG Cargo Simulator. The twelve-station system simulates both membrane and spherical LNG vessels and will be an integral part of the ten-day Person-in-Charge course, which is U.S. Coast Guard approved. The course also meets applicable standards for the following: U.S. Maritime Administration (MARAD). Det Norske Veritas (DNV). Society of International Gas Terminal and Tanker Operators (SIGTTO). The simulator will also be used in a number of other LNG related training courses that have been specifically designed for inspectors and terminal operators. The first class to use the new simulator is scheduled to begin in January 2008.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Finance

Former Petrobras Exec Sentenced to 5 Years Jail

A Brazilian judge sentenced a former international director at state-run oil firm Petroleo Brasileiro SA to five years in prison for money laundering on Tuesday,

Rising from the Ashes

The federal government is now taking steps to reverse its 2010 decision to terminate the nation’s LORAN program. The LORAN program was initiated during World War II,

Training: Cutting Costs While Remaining Cutting Edge

Businesses are operating in tough economic times, with budgets being significantly cut during the current industry downturn. Unfortunately, when lowering costs is a key priority,

Education/Training

Training: Cutting Costs While Remaining Cutting Edge

Businesses are operating in tough economic times, with budgets being significantly cut during the current industry downturn. Unfortunately, when lowering costs is a key priority,

Shanghai Shipyard Won Bid for Two Survey Vessels

Shanghai Shipyard has won bids to build two multipurpose survey vessels for two geological survey institutes. The shipyard is an affiliate of China State Shipbuilding Corporation (CSSC).

USCG Tall Ship Sailing to the Bahamas

The U.S. Coast Guard Cutter Eagle is scheduled to arrive at Berth 14 at Prince George Wharf in Nassau, Bahamas on Thursday, May 28 as part of its 2015 cadet summer training deployment.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1193 sec (8 req/sec)