More Dredging for Intrepid

Tuesday, November 14, 2006
Photo credit: Jennifer Rabulan

With the aid of Navy divers, dredging operations around the Intrepid began on Monday morning. The Navy’s efforts, costing about $3m, is targeted to pry the aircraft carrier’s propellers from the Hudson River mud and sediment. The Navy, as well as the Army Corps of Engineers, are dredging the mud under the stern of the 27,000-ton ship, hoping to ease the propellers to give way for an eventual tow. According to officials, the Navy bill is on top of a $60 million refit scheduled at Bayonne Drydock.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Daewoo Shipbuilding: $1.4 bln order Cancelled

Cancelled order part of Statoil's Bressay project. South Korea's Daewoo Shipbuilding & Marine Engineering Co Ltd on Friday said a 1.58 trillion won ($1.41 billion)

Asia Tankers-VLCC Rates Falter on Oil, Tanker Supplies

MidEast, West Africa rates hit 11-month low. Freight rates for very large crude carriers (VLCCs), which hit an 11-month low this week, could slide further next

Asia Dry Bulk-Capesize Steady as Owners Spurn Low Rates

Owners anchoring ships rather than fix at low rates. W. Australia-China capesize rates hit over two-month low. Freight rates for large capesize dry cargo ships

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0675 sec (15 req/sec)