Nantucket Sound Cape Wind Energy Project

Tuesday, November 09, 2004
The U.S. Army Corps of Engineers has prepared a Draft Environmental Impact Statement (DEIS) with regard to the proposed Cape Wind Energy Project on Horseshoe Shoal in Nantucket Sound. The project, if approved, would involve installation and operation of 130 wind turbine generators, an electric service platform, and associated cable in the Nantucket Sound area. Public meetings will be held in Oak Bluffs (December 6), West Yarmouth (December 7), Nantucket (December 8), and Cambridge (December 16). Written comments on the DEIS should be submitted by January 10, 2005. 69 Fed. Reg. 64919 (HK Law).
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Scanjet Secures 30-ship Tank Management Order

Scanjet Group has followed up its Tank Management order from Stolt-Nielsen with a series of contracts for its ITAMA Intelligent Tank Management concept including Tankcleaning,

Odfjell Finalizes LPG/Ethylene Joint Venture Deal

Following Odfjell SE’s May 16, 2014 announcement declaring the signing of a definitive agreement to form a LPG/E shipping joint venture, Odfjell today announced

Australia, US Order Anti-ship Missile Decoys

Design of the next generation of anti-ship missile decoys is set to commence following the signing of two contracts between the Australian Defense Force and BAE Systems Australia Pty Ltd.

Casualties

US Aircraft Carrier Crew Rescues Fishermen

Sailors and Marines aboard the U.S. Navy aircraft carrier USS Theodore Roosevelt (CVN 71) assisted two fishermen aboard a fishing vessel engulfed in flames off the east coast of Florida, Sept.

Maritime Reporter @ 75: The Daily Cartoon

Maritime Reporter & Engineering News was founded by John J. O'Malley (1905-1980) in 1939, and today ranks as the world's largest audited trade publication in the world serving the maritime industry,

Leak May Sideline New Mexico Nuclear Waste Site

It may be five years before a nuclear waste dump in New Mexico closed by a radiation leak is fully operational again, and the facility will need at least $240

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1656 sec (6 req/sec)