NASSCO Holds Ceremony for BP Tanker

Wednesday, October 20, 2004
National Steel and Shipbuilding Company (NASSCO) recently held a start-of-construction ceremony for NASSCO Hull 487, the fourth of four Alaska Class, double-hull oil tankers being constructed for BP Oil Shipping Company, USA. BP's Site Team Member Richard Blaine activated a robotic welding machine and cut the first piece of steel for the new ship.

"These double-hull tankers are among the most environmentally friendly ships ever built, incorporating the latest in tanker design and construction," said Richard Vortmann, president of NASSCO. "They will provide BP with the best available technology to protect US waters." Vortmann said the design of the four 1.3-million-barrel-capacity tankers in the Alaska Class will allow maximum flexibility for oil deliveries to West Coast ports, including BP refineries in Los Angeles and Cherry Point, WA.

Vortmann added that NASSCO is continuing to hire people to fill hundreds of positions that remain available for this and other shipbuilding programs in the company's 10-ship backlog.

The first ship, the Alaskan Frontier, was delivered to BP on August 11. On July 2, the second ship was floated out of NASSCO's graving dock following structural erection and its fitting out continues pierside. The third ship is under construction in the graving dock. The second, third and fourth ships are to be delivered in 2005 and 2006.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Coast Guard

Training Coastguards is Key to Tackling Piracy

Training and mentoring of coastguards in Africa, Middle East and South East Asia is essential if coastal nations are to have effective control over their Territorial Waters and Economic Zones,

26-year Jail Term Sought for Concordia Master

An Italian prosecutor asked a court on Monday to sentence the captain of the Costa Concordia cruise liner to more than 26 years in jail for his role in the 2012 disaster that killed 32 people.

Coast Guard Cutter William Trump Commissioned

The Coast Guard Cutter William Trump was commissioned during a ceremony at Coast Guard Sector Key West Saturday Jan. 24, 2015. The Trump is the 11th fast response cutter in the Coast Guard fleet.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Port Authority Salvage Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1781 sec (6 req/sec)