NASSCO Holds Keel-Laying Ceremony for BP Tanker

Wednesday, July 14, 2004

Stan Taylor (l) of the BP ship construction site team is congratulated by Richard Vortmann after welding his initials into the keel of Hull 486, signifying the start of construction on the vessel.

National Steel and Shipbuilding Company (NASSCO) held a keel-laying ceremony for Hull 486, the third of four Alaska Class, double-hull oil tankers being constructed for BP Oil Shipping Company, USA. BP's Site Team Member Stan Taylor welded his initials into the keel to signify the start of construction.

The first ship, the Alaskan Frontier, is being prepared for sea trials and will be delivered later this year. The second ship is undergoing construction and is scheduled to be delivered in 2005, with the third and fourth ships to be delivered in 2005 and 2006. The four ships are being constructed sequentially in NASSCO's 1,000-ft. graving dock.

"These tankers are environmentally friendly ships incorporating the latest in tanker design and construction," said Richard Vortmann, president of NASSCO. "They will provide BP with the best available technology to protect US waters." Vortmann said the design of the 1.3-million-barrel-capacity tankers in the Alaska Class will allow maximum flexibility for oil deliveries to West Coast ports, including BP refineries in Los Angeles and Cherry Point, Wash. "The BP tanker contracts have created hundreds of jobs for NASSCO and San Diego," added Vortmann, "and we are continuing to hire people to fill hundreds of positions that remain available for this and other shipbuilding programs. These ships are contributing millions of dollars in payroll, tax revenues and purchases from local suppliers each year during the life of the contracts."

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Electronics

Kongsberg Expands Louisiana Office, Training Facility

Kongsberg Maritime has purchased approximately 5.2 acres for new construction on an 82,980 sq ft office and training facility. Construction on the James Business

BCG Delivers Training Upgrades

Buffalo Computer Graphics delivered upgrades to Columbia Pacific Maritime in Portland and The River School in Memphis,. The River School ordered additional laptop

NOAA Satellites Help Rescue 240 People Last Year

Last year, 240 people were saved from potentially life-threatening situations throughout the United States and its surrounding waters with help from NOAA’s fleet of weather satellites.

Tanker Trends

Stolt-Nielsen Q4 Profit Misses Forecast

Shipping firm Stolt-Nielsen reported fourth quarter earnings below forecasts on Thursday and said it was concerned about the outlook for the chemical tanker market,

Wartsila Sees Low Oil Price Impacting Shipping

CEO cautious on 2015 outlook. Finnish ship engine and power plant maker Wartsila reported a smaller-than-expected quarterly profit and warned lower crude prices

Shipping Pollution Will Skyrocket -Study

International freight volumes will grow fourfold by 2050 while the average length of haul will increase by 12 percent over that time, trends that will cause a spike

 
 
Maritime Security Naval Architecture Navigation Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1312 sec (8 req/sec)