NASSCO Holds Keel-Laying Ceremony for BP Tanker

Wednesday, July 14, 2004
File

Stan Taylor (l) of the BP ship construction site team is congratulated by Richard Vortmann after welding his initials into the keel of Hull 486, signifying the start of construction on the vessel.

National Steel and Shipbuilding Company (NASSCO) held a keel-laying ceremony for Hull 486, the third of four Alaska Class, double-hull oil tankers being constructed for BP Oil Shipping Company, USA. BP's Site Team Member Stan Taylor welded his initials into the keel to signify the start of construction.

The first ship, the Alaskan Frontier, is being prepared for sea trials and will be delivered later this year. The second ship is undergoing construction and is scheduled to be delivered in 2005, with the third and fourth ships to be delivered in 2005 and 2006. The four ships are being constructed sequentially in NASSCO's 1,000-ft. graving dock.

"These tankers are environmentally friendly ships incorporating the latest in tanker design and construction," said Richard Vortmann, president of NASSCO. "They will provide BP with the best available technology to protect US waters." Vortmann said the design of the 1.3-million-barrel-capacity tankers in the Alaska Class will allow maximum flexibility for oil deliveries to West Coast ports, including BP refineries in Los Angeles and Cherry Point, Wash. "The BP tanker contracts have created hundreds of jobs for NASSCO and San Diego," added Vortmann, "and we are continuing to hire people to fill hundreds of positions that remain available for this and other shipbuilding programs. These ships are contributing millions of dollars in payroll, tax revenues and purchases from local suppliers each year during the life of the contracts."

Email AddThis Feed Button Share
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Electronics

Omega Launches New Thermocouple Connectors

Omega introduced compensated M12 thermocouple connectors, to be featured at Sensors Expo and Conference. The M12-FM series is a new Omega connector that will ensure accuracy for your applications.

High Power Phased Array Radar Development

The Australian Department of Defense released a request for tender to CEA Technologies for the development of a High Power Phased Array Radar concept demonstrator.

PSSA Interactive Display Launched at IMO

A new interactive display on Particularly Sensitive Sea Areas (PSSA) has been launched at IMO Headquarters and online at www.pssa.imo.org. A PSSA is an area

Tanker Trends

Jason Tieman to Address Upcoming ILTA Conference

PortVision’s Jason Tieman will speak to the International Liquid Terminals Association (ILTA) Conference on 'New Ways toMaximize Uptime & Utilization with Limited Resources'.

N.Y. Open House for Tanker's 75th Birthday

All are welcome to visit the Tanker Mary A. Whalen on Pier 11, Atlantic Basin, Red Hook, Brooklyn on Tuesday, May 21. Our short stay in Atlantic Basin, in Red

MHI : Landmark LNG Carrier Shipbuild Contract

On May 17, 2013, Mitsubishi Heavy Industries Ltd. (MHI) will sign an agreement with Mitsui O.S.K. Lines Ltd. (MOL) to build a Sayaendo series new-generation liquefied natural gas (LNG) carrier.

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright