NASSCO Starts Construction of Tenth T-AKE Ship

Wednesday, October 08, 2008

General Dynamics NASSCO began construction of the tenth ship of the U.S. Navy's T-AKE program. The ship will be named later and is scheduled to be delivered to the Navy in the third quarter of 2010.

The T-AKE ship incorporates international marine technologies and commercial ship-design features, including an integrated electric-drive propulsion system to minimize operating costs over its projected 40-year service life. The primary mission of the ships is to deliver as much as 10,000 tons of food, ammunition, fuel and other provisions to combat ships at sea. NASSCO has delivered the first five ships of the T-AKE class and has construction contracts for five additional ships. The Navy is expected to order the construction of a total of 14 ships.


Shipbuilding

Michelle Obama Sponsors Attack Submarine

General Dynamics Electric Boat has delivered to the U.S. Navy an attack submarine that is sponsored by first lady Michelle Obama and will be named for her home state, reports AP.

Croatia’s Jadrolinija to Buy New Passenger Ship

Croatia’s  largest national passenger shipping company Jadrolinija plans to expand its fleet with a new passenger ship, with the total cost of about 50 million euros, reports Poslovni.

MV WERFTEN, Foreship Sign Design Agreements

MV WERFTEN signed a letter of intent with the engineering company Foreship in Stralsund today. The agreement includes parts of the basic design as well as design,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0653 sec (15 req/sec)