Navibulgar Orders Three Ships

Friday, August 17, 2007
Navigation Maritime Bulgare (Navibulgar) has signed a contract to built three ships, according to a report on www.sofiaecho.com. According to the report, the three cargo ships will be built by Bulyard-Shipbuilding Industry AD, for delivery in December 2009, September 2011 and January 2012.
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

25,000-TEU Ships Possible, Not Practical

Maersk Line CEO Soren Skou said ships with capacities of 25,000 twenty-foot-equivalent units are possible but not practical today, and that he expects 18,000-19,

Floater Orders 2014

25 Units Orders in 2014:  10 FPSOs, 1 Barge, 4 FLNGs, 7 FSRUs & 3 FSOs The overall number of orders is similar to the average ordering pace over the past 10 years,

Editorial: Gettin’ Crabby with Deadliest Catch

As February is our traditional cruise shipping edition, naturally we’ve selected a fishing boat and two crabs for the cover. But as many of you may already know,

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0905 sec (11 req/sec)