Navy Awards Multi Ship/Multi Option Contract

Tuesday, December 21, 2004
The Navy awarded the East Coast Multi/Ship Multi Option (MS/MO) contract on Dec. 20 to Norfolk Shipbuilding and Drydock Corporation (NORSHIPCO) for DDG docking maintenance availabilities along with their associated non-docking availabilities.

The contract is a Cost Plus Award Fee contract type with hull specific maintenance availabilities, as well as Inter-availability Maintenance. "This contract transforms the way the Navy does maintenance and provides the Navy greater flexibility to support surge deployment vice the previous rotational posture," commented Rear Adm. Charles Hamilton, Program Executive Officer-Ships.

This contracting strategy allows the Navy to align contracting methodologies between coasts and make the most efficient use of current resources by establishing flexible, responsive repair contracts to meet changing fleet requirements and schedules. The MS/MO provides schedule savings through learning curve cost improvements, associated with long-term contracts, containing repetitive work throughout ship's training/deployment/ maintenance/modernization cycles, in order to reduce costs through the benefits of advanced planning and lessons learned.

This contract includes nine docking availabilities along with their associated non-docking availabilities. NORSHIPCO will be responsible for planning the availabilities. The contract also requires 40% of the direct production work to be subcontracted to at least two small businesses. NORSHIPCO's effectiveness in providing subcontracting to small business was evaluated as part of the contract award process and will be considered as part of the award fee to encourage the most efficient and practical use of small business.

This contract has a total estimated value of $50M. The $50M is based upon the successful offeror's response to the Government's notional work package in the solicitation over the life of the contract. Each availability is a contract option and will be priced by the contractor once the Navy provides a definitive work package for the contractor to price.

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Bollinger Fourchon: 13 Years Without a Lost Time Accident

Bollinger Shipyards, Inc. announced that their Bollinger Fourchon, L.L.C. facility has worked 13 years without a lost time accident. Building on a philosophy that starts at the top,

Messer's CEO Norville Announces Retirement

Bill Heller to assume the position as Messer Cuttings Systems’ President and CEO Gary Norville started at Messer Cuttings Systems Inc. in September 1980 selling and installing cutting machines.

Rohr Dredge Continues European Expansion

Rohr International Dredge Holdings, Inc. announced that it acquired Eurl Rohr France, including its current backlog, inventory and all associated intellectual property (IPR), on July 23, 2014.

Navy

The Martitime Security Focus Is Shifting

Former Vice-Admiral and Commander-in-chief of the German Navy Hans-Joachim Stricker, President of the German Maritime Institute (DMI), believes that in terms of

VSTEP Wins Mexican Navy Simulator Contract

The Mexican Navy selected VSTEP to supply a Class A NAUTIS Full Mission Bridge (FMB) Simulator and 24 NAUTIS desktop trainer stations for the Naval Academy in Veracruz.

Today in U.S. Naval History: July 29

Today in U.S. Naval History - July 29 1846 - Sailors and Marines from U.S. sloop Cyane capture San Diego, Calif. 1918 - Assistant Secretary of the Navy Franklin D.

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1342 sec (7 req/sec)