Navy Awards Northrop Grumman Perfect Scores on Restoration of USS Cole

Monday, May 13, 2002
Northrop Grumman Corporation announced today that the U.S. Navy has awarded Northrop Grumman Ship Systems perfect scores for the work accomplished during the final phase of restoration of the Aegis guided missile destroyer USS Cole (DDG 67). Northrop Grumman Ship Systems received the highest marks possible in the specified performance areas of Schedule, Technical, Management and Cost for the performance period from January through April 2002; and, based on the perfect scores, the Navy awarded Northrop Grumman $3.9 million in performance award fee funding. The USS Cole, which was redelivered ahead of schedule, sailed from Northrop Grumman Ship Systems' Ingalls facility in Pascagoula, Miss., April 19, 2002, and returned to her homeport in Norfolk, Va., April 24, 2002. "The Navy's performance award is a tribute to the employees of Northrop Grumman Ship Systems and their ability to fulfill each task efficiently and on schedule," said Dr. Philip A. Dur, Northrop Grumman corporate vice president and president of the company's Ship Systems sector. "The USS Cole is a national symbol of the indomitable spirit of the United States Navy. She was repaired with emotion, energy and a deeply felt sense of patriotism by our shipbuilders in Pascagoula." Following a terrorist attack in Aden, Yemen, in October 2000, the ship underwent an extensive 14-month restoration project. Exactly 18 months later, the ship went to sea April 12 for her first underway period since the attack, fully testing all systems, including propulsion plant, main machinery and auxiliary machinery that required extensive repair or replacement during the restoration period.
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Yanmar Diesel Engines for Fast New Crew Tender

The expansion of the number of wind turbines out at sea near the northern Dutch coast was reason enough for Ubels Offshore to expand its fleet with a fifth ship last year.

The Hour of Power: Hybrid Marine Technology and Green Ports

In 2015 two significant developments are going to make many operators, owners and builders of professional vessels consider hybrid marine power. Firstly the new emissions laws in ports,

GTT Records Order for 2 LNG Tankers

GTT receives a new order from Hyundai Samho Heavy Industries for two LNGCs for Teekay   GTT, a designer of membrane containment systems for the maritime transportation

Navy

European Court Ups Standards for River Dredging

The European Court of Justice (ECJ) ruled on Wednesday that damage to water quality must be considered when authorities approve river dredging to expand ports,

UK Navy’s Ice Patrol Ship Gets a New Coating

U.K. Royal Navy Ice Patrol Ship HMS Protector is deployed on operations for 330 days a year, mostly in the Antarctic region, making it essential that her underwater

Crowley Takes Over Management of MSC Ships

Crowley strengthens relationship with U.S. Navy, completes turnover of Military Sealift Command T-AGOS/T-AGM fleet   Crowley Maritime Corp. announced its global

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1170 sec (9 req/sec)