Navy Budgets for Future Force

Friday, February 17, 2006
President Bush submitted his 2007 fiscal year (FY) budget request to Congress recently, which included the Navy's $127 billion budget proposal. The president's budget request was also accompanied by the recently released Department of Defense's Quadrennial Defense Review (QDR). The Navy's proposed budget boasts a $4.4 billion increase from last year's baseline appropriations. If approved, the FY07 - FY11 budget provides the necessary funding levels to sustain current readiness, build the fleet for the future and develop the 21st Century Sailor over the next four years, which means a possible increase in pay and benefits, as well as several quality of life improvements. According to Navy leaders, the requested budget proposes a 5.9 percent increase in basic allowance for housing, a 2.2 percent pay increase and improved facilities for schools and child care. Other proposed FY07 - FY11 budget highlights include the construction of seven ships and funding for 165 aircraft, for a total of 51 new ships and 1,150 new aircraft. The FY07 construction and production plan includes two Littoral Combat Ships, two DD(X) destroyers, one Virginia-class submarine, one LHA (R), one T-AKE, 12 EA-18G Growlers, 14 MV-22 Ospreys, 30 F/A-18 Hornets, 21 Joint Primary Air Training Systems and four KC-130Js. (Source: http://www.dcmilitary.com)
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Navy to Commission Submarine North Dakota

The Navy will commission its newest attack submarine North Dakota, during a ceremony Saturday, Oct. 25, 2014, at Submarine Base New London in Groton, Connecticut.

US Navy CNO: Photo of the Day

Chief of Naval Operations (CNO) Adm. Jonathan Greenert receives a system update brief in the combat information center aboard the Arleigh Burke-class guided-missile

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

 
 
Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1032 sec (10 req/sec)