New Launching Platform For Navy Ships

Monday, May 07, 2001
The Navy will soon enter a new era of ship construction in Bath, Maine. The introduction of an innovative construction and launching platform brings some of the most modern warship building methods in the world to Bath Iron Works and the Naval Sea Systems Command (NAVSEA). May 5 marks the first official use of what is known as the Land Level Transfer Facility (LLTF). The day will see the keel laying of the future USS CHAFEE (DDG 90), an Arleigh Burke-class destroyer, co-sponsored by Mrs. John Chafee, widow of the Honorable John Chafee, a former Secretary of the Navy and Senator from Rhode Island, along with Mrs. Diane Blair, wife of Admiral Dennis Blair, Commander-in-Chief, U.S. Pacific Command. The Land Level Transfer Facility is a construction platform with three side-by-side shipways that allow for amphibious ships and destroyers to be built simultaneously. Outfit support towers alongside the ships are designed to provide the work force all the material and services they need. These towers have tool cribs, slump material stock rooms, office space, restrooms, and lunchrooms built in to help improve productivity. Additionally, a 75,000-sq. ft. Manufacturing Support Center will house shipyard manufacturing supervision, design, planning, quality assurance office, material control professionals, and personnel from NAVSEA's Supervisor of Shipbuilding, Conversion, and Repair (SUPSHIP) Bath in a true integrated process team environment. The advantages of the new Land Level Transfer Facility are many. Weighing more than 400 tons each, the first erection units of CHAFFEE are the largest ever produced by Bath Iron Works. These erection units can be much heavier than those placed on traditional sliding ways but will be able to be placed on the LLTF. Another advantage of the facility is the capability to install sonar domes before a ship is launched. Previously, ships had to be drydocked in Portland, Maine for sonar dome installation. Now all operations will be consolidated in Bath Commenting on the benefits of the new facility, Captain Richard Hepburn, Supervisor of Shipbuilding, SUPSHIP Bath said, "It was an enormous investment by General Dynamics (owner of Bath Iron Works); but one which looks to pay off with the potential of considerable production savings on each hull. Bath Iron Works, the U.S. Navy, the employees of Bath Iron Works, the American taxpayers, and the nation's defense, are all winners with this magnificent facility in operation. Our Navy and our country will be stronger for it." - (By Richard Osial, NAVSEA Logistics, Maintenance and Industrial Operations)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

STX Sells Lorient Shipyard

The shipbuilding group STX France has offloaded its Lorient shipyard to a naval consortium.    The shipyard, which has produced civil and naval vessels, will be purchased by Kership,

FIO’s New Research Vessel Enters Build Phase

The 78’ research vessel designed and engineered by Boksa Marine Design (BMD) in 2015 is headed to the building phase beginning in June.   BMD contracted with

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

 
 
Maritime Careers / Shipboard Positions Maritime Security Offshore Oil Pod Propulsion Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0728 sec (14 req/sec)