New Launching Platform For Navy Ships

Monday, May 07, 2001
The Navy will soon enter a new era of ship construction in Bath, Maine. The introduction of an innovative construction and launching platform brings some of the most modern warship building methods in the world to Bath Iron Works and the Naval Sea Systems Command (NAVSEA). May 5 marks the first official use of what is known as the Land Level Transfer Facility (LLTF). The day will see the keel laying of the future USS CHAFEE (DDG 90), an Arleigh Burke-class destroyer, co-sponsored by Mrs. John Chafee, widow of the Honorable John Chafee, a former Secretary of the Navy and Senator from Rhode Island, along with Mrs. Diane Blair, wife of Admiral Dennis Blair, Commander-in-Chief, U.S. Pacific Command. The Land Level Transfer Facility is a construction platform with three side-by-side shipways that allow for amphibious ships and destroyers to be built simultaneously. Outfit support towers alongside the ships are designed to provide the work force all the material and services they need. These towers have tool cribs, slump material stock rooms, office space, restrooms, and lunchrooms built in to help improve productivity. Additionally, a 75,000-sq. ft. Manufacturing Support Center will house shipyard manufacturing supervision, design, planning, quality assurance office, material control professionals, and personnel from NAVSEA's Supervisor of Shipbuilding, Conversion, and Repair (SUPSHIP) Bath in a true integrated process team environment. The advantages of the new Land Level Transfer Facility are many. Weighing more than 400 tons each, the first erection units of CHAFFEE are the largest ever produced by Bath Iron Works. These erection units can be much heavier than those placed on traditional sliding ways but will be able to be placed on the LLTF. Another advantage of the facility is the capability to install sonar domes before a ship is launched. Previously, ships had to be drydocked in Portland, Maine for sonar dome installation. Now all operations will be consolidated in Bath Commenting on the benefits of the new facility, Captain Richard Hepburn, Supervisor of Shipbuilding, SUPSHIP Bath said, "It was an enormous investment by General Dynamics (owner of Bath Iron Works); but one which looks to pay off with the potential of considerable production savings on each hull. Bath Iron Works, the U.S. Navy, the employees of Bath Iron Works, the American taxpayers, and the nation's defense, are all winners with this magnificent facility in operation. Our Navy and our country will be stronger for it." - (By Richard Osial, NAVSEA Logistics, Maintenance and Industrial Operations)
Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Damen Outfitting First of Nine Bahamas Patrol Boats

The first of nine Damen Stan Patrol 3007s ordered by the Royal Bahamas Defense Force has arrived at Damen Shipyards Gorinchem in the Netherlands for outfitting.

Liquefaction Terminals to Dominate LNG Capital Expenditure

Capital expenditure (Capex) on global LNG facilities is expected to total $259 billion (bn) over the period 2015-2019, with investments expected to be 88% larger

New Chinese Shipyard Launches First Ship

The new shipyard facility of Honghua Offshore Oil & Gas Equipment Company in Jiangsu, China, has launched its first ship, an IMT982 Platform Supply Vessel. The vessel,

 
 
Maritime Security Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1164 sec (9 req/sec)