New Mooring Technology for Oil & Gas Operators

Tuesday, April 28, 2009

Measurement Technology NW has recently completed a contract to provide an eight-point mooring monitoring system for the National Petroleum Construction Company (NPCC) in Abu Dhabi, U.A.E. Designed for NPCC's SEP-350 (Self Elevating Platform) vessel, the new running line tensiometer and LCI-90 Dual Winch display system replaces an old four-point mooring installation that no longer met the company's performance standards.

The opportunity to continuously monitor current trends and historical peak loads locally at the mooring station, in the control room and off-site through the PC increases the safety factor. Without historical logging of peak tension loads, rig and risk managers must rely on visual inspections and guesses about wear and tear on their vital mooring systems.

NPCC's new mooring instrumentation consists of eight running line load monitors optimized for 1.5" wire rope and equipped with rotational and force transducers in a removable center sheave.

Measurement Technology NW Line Control Instruments (LCI) produces a range of precision line control products, including the LCI-90 and LCI-100 series displays, WinchDAC and MarQuip Mooring software.

Look for MTNW at the Offshore Technology Conference in Houston, Texas, May 4-May 7, 2009, booth #8844.

(www.mtnw-usa.com)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Norwegian Unions Say 755 O&G Workers Could Strike

About 755 Norwegian workers on seven oil and gas fields could go on strike from Saturday, hitting output from western Europe's top producer, if a new wage deal is not agreed before a Friday deadline,

POSH Bags Shell FLNG Contract

Singapore’s offshore marine services provider PACC Offshore Services Holdings Ltd. (POSH) has been awarded a contract to support Shell’s Prelude floating liquefied

US Oil Drillers Cut Rigs after 3 Weeks of Additions

U.S. oil drillers cut rigs this week for a 20th week this year after three weeks of additions, according to a closely followed report on Friday, as crude prices

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0684 sec (15 req/sec)