New Navy Contract

Monday, December 08, 2008

Raytheon Co., Integrated Defense Systems, Tewksbury , Mass., is being awarded an $8,976,435 modification to previously awarded contract (N00024-05-C-5346) for the non-recurring engineering effort to update selected Zumwalt Class Destroyer Mission Systems Equipment for initial integration efforts at Wallops Island, Va., and follow-on installation on board Navy's Self Defense Test Ship (SDTS) to mitigate production and integration risk and conduct at sea testing in support of the Zumwalt TEMP (test and evaluation master plan). The SDTS test will include the first missile firing with this advanced Mission System from a remote controlled shipagainst the most stressing targets available. The purpose of this effort is to initiate the non-recurring engineering work required to make the selected Mission System Equipment (Dual Band Radar SPY-3 Array and REX; MK57 Vertical Launch System Electronics Module Controller Unit; Canister Electronic Units, and Total Ship Computing Environment) compatible with the Navy's Self Defense Test Ship. Work will be performed in Portsmouth R.I. (55 percent), Tewksbury, Mass. (25 percent), Andover, Mass. (20 percent), and is expected to be completed by August 2009. Contract funds in the amount of $8,976,435 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.

Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Ballast Water System Retrofits for 11 Containerships

Eleven container vessels owned by Bernhard Schulte GmbH & Co. KG, based in Germany, are to be retrofitted with Wärtsilä Aquarius Ballast Water Management Systems (BWMS), Wärtsilä announced today.

Timing in Doubt on Hapag-Lloyd IPO

German container shipping group Hapag-Lloyd has taken further steps in preparation of a stock market listing and has mandated more banks for the move, but it remains

Asia Tankers-VLCC Rates Will See More Volatility

VLCC market to be "hot" in Q4 -VLCC broker. Freight rates for very large crude carriers (VLCCs) face a roller-coaster ride on uncertain cargo volumes and vessel

Navy

HMS Prince of Wales’ Final Carrier Block Delivered

The final sections of the second Queen Elizabeth Class aircraft carrier produced by Cammell Laird arrived at Babcock Rosyth Facilities in Fife on Thursday, September 3,

Canadian Frigates Get a Radar Upgrade

German navigation system manufacturer Raytheon Anschütz has completed factory acceptance tests and delivery of 12 sets of navigation radars for the Canadian Navy’s Halifax-class frigates.

Virginia-Class Submarine Named USS Iowa

Secretary of the Navy Ray Mabus hosted a ship-naming ceremony today in Ames, Iowa to announce that SSN 797, a Virginia-class attack submarine, will bear the name USS Iowa.

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3508 sec (3 req/sec)