New Navy Contracts

Wednesday, October 21, 2009

Northrop Grumman Shipbuilding, Inc., Newport News, Va., is being awarded $7,000,000 modification to previously awarded contract (N00024-08-C-2100) for planned and growth supplemental work for the accomplishment of the fiscal year 2008 extended drydocking selected restricted availability (EDSRA) of USS Enterprise (CVN 65).  EDSRAs are similar to an overhaul in that it will restore the ship, including all subsystems that affect combat capability and safety, to established performance standards.  This will also provides an opportunity to perform hull inspections and recoating, and other maintenance related evolutions below the waterline that cannot be accomplished while the ship is waterborne.  Work will be performed in Newport News, Va., and is expected to be completed by January 2010.  Contract funds in the amount of $7,000,000 will expire at the end of the current fiscal year.  The Naval Sea Systems Command, Washington, D.C., is the contracting activity.

Northrop Grumman Shipbuilding Inc., Newport News, Va., is being awarded a $12,104,240 modification to previously awarded contract (N00024-07-C-4404) for the USS Ronald Reagan (CVN-76) fiscal 2010 Planned Incremental Availability (PIA).  A PIA provides for an extensive renovation and modernization of an aircraft carrier, including alterations and repairs as well as inspection and testing to all ships systems and components ensuring safe and dependable operation of the ship.  Work will be performed in San Diego and is expected to be completed by May 2010.  Contract funds in the amount of $12,104,240 will expire at the end of the current fiscal year.  The Southwest Regional Maintenance Center, San Diego is the contracting activity.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Imabari to Construct Newbuilding Dry Dock

In order to accommodate construction of Ultra-Large newbuilding vessels including recently secured 20,000TEU Mega container ships (about 400m in length and about 59m breadth),

Long Beach Port to Boost Power, Speed Clearance

Port of Long Beach Chief Executive Jon Slangerup on Thursday unveiled ambitious plans for congestion-beating smart systems for cargo movement and an all-out

31 ARENA Projects Completed

ARENA has invested $1 billion in more than 230 projects, fellowships and scholarships that are paving the way for a more diverse energy future for Australia.

Navy

SECNAV Completes Visit to Paraguay

Secretary of the Navy (SECNAV) Ray Mabus completed a visit to Paraguay Jan. 29 during which he met with Republic of Paraguay President Horacio Cartes to discuss

Australia Gives Landing Craft to the Philippines

The Australian Government will gift two recently-decommissioned Landing Craft Heavy vessels, including a package of spare parts, to the Philippines Government,

Cutlass Express 2015 Commences

Maritime forces from East Africa, South Africa, Europe, Indian Ocean nations, the United States and several international organizations began the fourth iteration

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pipelines Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1160 sec (9 req/sec)