New Orleans Meet New Orleans

Monday, October 23, 2006
The amphibious transport dock ship New Orleans (LPD 18) sailed away from Northrop Grumman Corporation's New Orleans facility early Monday morning for her builder's sea trial. The 684-ft. ship sailed down the Mississippi River past the New Orleans skyline en route to the Gulf of Mexico where she will undergo testing of all the ship's systems while at sea. Following sea trial, shipbuilders will continue to work final details in preparation for the U.S. Navy's Board of Inspection and Survey's acceptance sea trial scheduled later this year. The ship is scheduled to be delivered in early 2007.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

PALFINGER Finalizes Harding Acquisition

The PALFINGER Group closed the acquisition of 100 percent of the shares in Herkules Harding Holding AS, i.e. the globally operating Harding Group, supplier of lifesaving

ClassNK Amends IGC Code Rules and Guidance

Classification society ClassNK has amended its Rules and Guidance for the Survey and Construction of Steel Ships in response to the latest industry developments,

Mersey Maritime: Small Business at Heart of Isle of Man Partnership

UK Industry trade body Mersey Maritime has announced a new trade agreement with the Isle of Man Shipping Association (IOMSA) which aims to supercharge bilateral trade,

Navy

Beijing Slams South China Sea Court Proceedings

Permanent Court of Arbitration ruling set for July 12. An international court said it would deliver a hotly anticipated ruling in the Philippines' case against

Russian Sub 'Stary Oskol' Enters Black Sea

Russia’s Stary Oskol submarine, the third boat in Project 636.3 series for the Black Sea Fleet, on a voyage to its permanent base has passed the Bosporus and Dardanelles straits,

Future LCS Charleston’s Keel Authenticated

A ceremony was hosted to celebrate the keel authentication of the U.S. Navy's future USS Charleston (LCS 18), the ninth Independence variant littoral combat ship, June 28.

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1012 sec (10 req/sec)