New USACE Contracts

Tuesday, March 02, 2010

Weeks Marine, Inc., Covington, La., was awarded on Feb. 25, 2010, a $58,509,050 firm-fixed-price contract for work consisting of mechanical and hydraulic construction of containment levees requiring deep excavation to minus-70 ft, shoreline protection, and spillbox rehab to increase the capacity of Placement Areas 14 and 15; and maintenance and new work dredging of the Houston Galveston Navigation Channel Bayport to Morgans Point with four options.  Work is to be performed at Harris County, Texas, and Chambers County, Texas, with an estimated completion date of March 31, 2012.  Thirty-four bids were solicited with four bids received.  U.S. Army Engineer District Galveston, Texas, is the contracting activity (W912HY-10-C-0016).

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

PSV Launching Ceremony at Gondan

At high tide today at Gondan Shipyard in Figueras, the New PSV (TBN) for the Norwegian Ship-Owner, Simon Møkster Shipping, was launched. Different personalities

Vigor’s Tacoma Yard Delivers Breasting Barges to Foss

Vigor Industrial expands its newbuild capacity in Washington; Tacoma yard delivers three breasting barges   Fabrication teams at Vigor Industrial’s Tacoma, Wash.

Hands Across the Water

U.S. firms leverage Netherlands-based Damen Shipyard’s vessel designs and technical support. For nearly 40 years, Damen Shipyards Group in the Netherlands has

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Pipelines Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1242 sec (8 req/sec)