New USACE Contracts

Tuesday, March 02, 2010

Weeks Marine, Inc., Covington, La., was awarded on Feb. 25, 2010, a $58,509,050 firm-fixed-price contract for work consisting of mechanical and hydraulic construction of containment levees requiring deep excavation to minus-70 ft, shoreline protection, and spillbox rehab to increase the capacity of Placement Areas 14 and 15; and maintenance and new work dredging of the Houston Galveston Navigation Channel Bayport to Morgans Point with four options.  Work is to be performed at Harris County, Texas, and Chambers County, Texas, with an estimated completion date of March 31, 2012.  Thirty-four bids were solicited with four bids received.  U.S. Army Engineer District Galveston, Texas, is the contracting activity (W912HY-10-C-0016).

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Vestas Profit Beats Forecast

Danish wind turbine maker Vestas Wind Systems posted much higher than expected second-quarter earnings and slightly increased its guidance for the full year, signaling

OSV Hull Arrives at Havyard's Leirvik Yard

Havyard says that newbuild number 118 has arrived from Turkey at the yard in Leirvik, being the first of two vessels that will be outfitted to provide service and

SBI Wins Jack-up Design and Engineering Contract

SBI Offshore Limited, which is pursuing higher-value oil and gas engineering projects, said today it has secured a $24 million contract to provide design and engineering

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1342 sec (7 req/sec)