New Volvo Penta Between Regular Runs

Friday, January 11, 2002
MF Vardehorn, a Norwegian car and passenger ferry, was having problems with one of its four propulsion engines. The contract to replace the engine was awarded to Marhaug A/S, Volvo Penta’s dealer in Svolvaer, Norway. The replacement, which involved cutting holes in the ship’s hull to install the new engine, was completed between two scheduled runs by the ferry.

“We are extremely satisfied with the engine replacement and the manner in which Volvo Penta helped us solve our problem. The work was completed quickly, without requiring us to take the ferry out of traffic,” says shipping company inspector Jan Sletteng of TFDS, owner of the MF Vardehorn.

Volvo Penta has been expanding its product program by including marine diesel engines with cylinder volumes ranging from 25 to 65 liters. The expanded engine program has enabled Volvo Penta to compete for contracts that require completely new types of installations. The MF Vardehorn is propelled by four diesel engines connected to a diesel-electric drive system. The ship’s new engine is a 460-kW Volvo Penta D30A MT. The engine replaced a similar machine supplied by another manufacturer that has experienced problems with cavitation in the engine block and excessive wear.

“The new engine was mounted on the existing frame and connected to the existing generator. However, after conducting a fault-tracking test on the old engine, we made certain changes in the installation to solve the problems with cavitation,” says Jan Marhaug of Marhaug A/S. Night work The MF Vardehorn operates in regularly scheduled traffic between Hareid and Sulesund in Sunnmöre. Two ferries service the line, and the engine was replaced at night without any disruptions in scheduled crossings. Careful preparations were made before the ship was brought in for its depot stop on Saturday afternoon. “We cut a hole in the hull at 5:30 in the evening, and the engine was installed early Sunday morning. The ferry was back in operation with three engines for the morning run at 9:30 a.m., and we continued our installation onboard. All four engines were fully functional on Monday, and the ferry was completely back to normal,” says Jan Marhaug.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Andrews to Lead CWind’s O&M Division

Lee Andrews has been appointed as CWind’s new global head of operations for maintenance and asset management (O&M) services.   Andrews joins CWind from Siemens

US Orders Trawler with Common-Rail Technology

Tier II-compliant 32/44CR technology to deliver fuel efficiency, low emissions and improved productivity   MAN Diesel & Turbo has received an order for an MAN

Environmental Awards Recognize 84 Foss Vessels

With a combined 840 years without an environmental incident, 84 Foss Maritime and subsidiary companies' tugs and tank barges have been recognized by a major maritime

Marine Electronics

MSC Cruises Advance Onboard Wi-Fi System

MSC Cruises has started a fleet-wide optimization installed by Marlink to improve shipboard VSAT (Very Small Aperture Terminal) connectivity. MSC Cruises said it

ST Engineering Rejigs Top Deck

Singapore Technologies Engineering Ltd (ST Engineering) today announced the appointment of senior management personnel to new key management positions in the

Atteridge Retires from Furuno USA

After 30 years of service to Furuno USA, Inc., Jim Atteridge is retiring as President and assuming a new role, as Director and Corporate Advisor. Effective December 1,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1879 sec (5 req/sec)