New Volvo Penta Between Regular Runs

Friday, January 11, 2002
MF Vardehorn, a Norwegian car and passenger ferry, was having problems with one of its four propulsion engines. The contract to replace the engine was awarded to Marhaug A/S, Volvo Penta’s dealer in Svolvaer, Norway. The replacement, which involved cutting holes in the ship’s hull to install the new engine, was completed between two scheduled runs by the ferry.

“We are extremely satisfied with the engine replacement and the manner in which Volvo Penta helped us solve our problem. The work was completed quickly, without requiring us to take the ferry out of traffic,” says shipping company inspector Jan Sletteng of TFDS, owner of the MF Vardehorn.

Volvo Penta has been expanding its product program by including marine diesel engines with cylinder volumes ranging from 25 to 65 liters. The expanded engine program has enabled Volvo Penta to compete for contracts that require completely new types of installations. The MF Vardehorn is propelled by four diesel engines connected to a diesel-electric drive system. The ship’s new engine is a 460-kW Volvo Penta D30A MT. The engine replaced a similar machine supplied by another manufacturer that has experienced problems with cavitation in the engine block and excessive wear.

“The new engine was mounted on the existing frame and connected to the existing generator. However, after conducting a fault-tracking test on the old engine, we made certain changes in the installation to solve the problems with cavitation,” says Jan Marhaug of Marhaug A/S. Night work The MF Vardehorn operates in regularly scheduled traffic between Hareid and Sulesund in Sunnmöre. Two ferries service the line, and the engine was replaced at night without any disruptions in scheduled crossings. Careful preparations were made before the ship was brought in for its depot stop on Saturday afternoon. “We cut a hole in the hull at 5:30 in the evening, and the engine was installed early Sunday morning. The ferry was back in operation with three engines for the morning run at 9:30 a.m., and we continued our installation onboard. All four engines were fully functional on Monday, and the ferry was completely back to normal,” says Jan Marhaug.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

MN 100: AEP River Operations

16150 Main Circle Drive, Suite #400 St. Louis, MO 63017 Tel: (636) 530-2100  Email: info@aepriverops.com Website: www.aepriverops.com President: Keith Darling The

MN 100: Caterpillar Marine

Neumühlen 9 22763 Hamburg/Germany Tel: (713) 895-1449 Email: cat_power@cat.com Website: www.marine.cat.com Managing Director: Nigel Parkinson The Company: Caterpillar

Airbus May Sell Stake in Submarine Supplier

Airbus is considering a sale of its 49 percent stake in submarine supplier Atlas Elektronik as part of a reshuffle of its military business, German newspaper Die

Marine Electronics

Servowatch to Showcase New AMC Range at SMM

Servowatch Systems, a U.K.-based business unit of the Electrical and Automation division of India’s engineering giant Larsen & Toubro, said its exhibition stand

Krill Supplies VFMMS to Island Tug and Barge

Krill Systems Inc., a producer of Vessel Fuel Measurement and Monitoring Systems (VFMMS), announced delivery, installation and successful sea trials of three more systems to Island Tug and Barge Ltd.

Harris Secures Certification for its Multi-channel Manpack Radio

Harris Corporation (NYSE:HRS) has received Type-1 National Security Agency (NSA) certification for its Falcon III® RF-340M multi-channel manpack radio. The certification

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0959 sec (10 req/sec)