Newest U.S. Navy Logistics Ship Launched

Tuesday, August 18, 2009

USNS Matthew Perry, which will be the newest ship in the U.S. Navy's Lewis and Clark-class of dry cargo/ammunition ships, was christened and launched Aug.16, during a late afternoon ceremony at the General Dynamics NASSCO shipyard in San Diego. The ship, designated T-AKE 9, is expected to be delivered to the Navy's Military Sealift Command in early 2010 following a series of tests and sea trials.

The 689-ft ship slid into the water for the first time as Hester G. Evans - a great, great, great granddaughter of the ship's namesake and the ship's sponsor - broke the traditional bottle of champagne against the ship's bow, christening it USNS Matthew Perry.

The ship honors Navy Commodore Matthew C. Perry (1794 - 1858), whose distinguished naval career spanned 50 years. In 1853, Perry led a squadron of ships to Japan, where he successfully negotiated a landmark trade treaty with the Japanese. Perry also served during the War of 1812, the Mexican-American War, and sailed off the coast of Africa to suppress the slave trade.

"I am confident this fine vessel will well represent the spirit, tenacity and fortitude of her namesake," said Vice Adm. Richard W. Hunt, commander, U.S. 3rd Fleet, as he addressed the nearly 2,000 people present at the event, including distinguished guests from the U.S. military, maritime industry, and state and local government.

"USNS Matthew Perry and her sister ships represent the lifeline of our Navy, and are absolutely a vital underpinning of our maritime strategy," said Hunt. "These ships' ability to carry a wide range of critical supplies and equipment, and to operate independently at sea for extended periods of time, translates into a higher state of readiness for our combatant ships."

Perry is the ninth ship in the Navy's T-AKE class. These ships are owned and operated by MSC and deliver ammunition, provisions, spare parts, potable water and petroleum products to U.S. Navy and other navy ships at sea, allowing them to stay underway and combat ready for extended periods of time. The ships are crewed by 124 civil service mariners working for MSC along with 11 U.S. Navy sailors, who provide supply coordination.

"The ship has a great crew and we are all ready to get onboard, get settled and get going with the work we do for MSC," said Capt. William Baldwin, Perry's civil service master.  "We're off to a really good start."

Construction began on Perry in October 2008. Once delivered to MSC, Perry is slated to operate out of San Diego. The Navy plans to build 14 dry cargo/ammunition ships, all of which will be owned and operated by MSC.

MSC operates approximately 110 noncombatant, civilian-crewed ships that replenish U.S. Navy ships, conduct specialized missions, strategically preposition combat cargo at sea around the world and move military cargo and supplies used by deployed U.S. forces and coalition partners.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

US & ROK Navies to Participate in Exercise Clear Horizon

The U.S. and Republic of Korea (ROK) navies will participate in Exercise Clear Horizon, October 20-24, in waters south of the Korean peninsula. Clear Horizon

Mount Whitney Departs Batumi, Georgia

The U.S. 6th Fleet command and control ship USS Mount Whitney (LCC 20) departed Batumi, Georgia, Oct. 18 after completing a successful port visit. While in Batumi,

USS Constitution Not to Set Sail Until 2018

The crew of USS Constitution embarked on their final Boston Harbor underway demonstration aboard Old Ironsides this year, Oct. 17. Constitution set out into

Vessels

TRIYARDS Buys into Aluminium Shipbuilding Expertise

TRIYARDS Holdings Limited, an offshore vessel fabrication and engineering solutions provider to the oil and gas (O&G) industry, has added new capabilities, products

Singapore’s MPA Discuss LNG Bunkering

The Maritime and Port Authority of Singapore (MPA), Antwerp Port Authority, Port of Rotterdam and Port of Zeebrugge participated in a Liquefied Natural Gas (LNG)

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2849 sec (4 req/sec)