Nord Stream Withdraw to Build Service Platform

Wednesday, April 09, 2008

Nord Stream AG has withdrawn the conditional application to the Swedish government to build a service platform off the coast of . Using advanced technology, the consortium now plans to build its pipeline across the without such a platform. Reflecting these plans and responding to Swedish Government requests, Nord Stream is supplementing the documentation accompanying its application to build the pipeline through Swedish waters. 
In December 2007, Nord Stream submitted a conditional application to build a service platform northeast of the in the Swedish Exclusive Economic Zone (EEZ). Since submitting this application, Nord Stream has continued to seek maintenance solutions for the pipeline without building an intermediate service platform. In view of the debate and concerns in regarding the platform, Nord Stream is pleased that technological advances obviate the need for a platform at the mid-point of the planned pipeline route. 
Pipeline maintenance will be undertaken through the deployment of intelligent pipeline inspection gauges (“pigs”). Suppliers have confirmed that an inspection gauge will be able to travel the entire length of the pipeline. Currently, studies are being finalised which describe the technical design of these gauges. Other pipeline projects, such as Franpipe and Langeled, show that long distance pigging is feasible for long high-pressure, large-diameter pipes. 
Together with the applications for a platform and the pipeline system submitted in December 2007, Nord Stream provided an environmental study that describes the potential impact of the pipelines on the environment. This report is equivalent to an Environmental Impact Assessment (EIA) for the Swedish part of the project and was provided even though it is not required under Swedish law.
As already announced in December, Nord Stream will supplement its application documentation for the pipeline system in accordance with the government's request and in accordance with Swedish and international law. Nord Stream believes that all prerequisites have been met to start dialogue with the Swedish government about this important project for meeting ’s energy supply needs and protecting the climate. 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Port Authority Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0743 sec (13 req/sec)