Nord Stream Withdraw to Build Service Platform

Wednesday, April 09, 2008

Nord Stream AG has withdrawn the conditional application to the Swedish government to build a service platform off the coast of . Using advanced technology, the consortium now plans to build its pipeline across the without such a platform. Reflecting these plans and responding to Swedish Government requests, Nord Stream is supplementing the documentation accompanying its application to build the pipeline through Swedish waters. 
In December 2007, Nord Stream submitted a conditional application to build a service platform northeast of the in the Swedish Exclusive Economic Zone (EEZ). Since submitting this application, Nord Stream has continued to seek maintenance solutions for the pipeline without building an intermediate service platform. In view of the debate and concerns in regarding the platform, Nord Stream is pleased that technological advances obviate the need for a platform at the mid-point of the planned pipeline route. 
Pipeline maintenance will be undertaken through the deployment of intelligent pipeline inspection gauges (“pigs”). Suppliers have confirmed that an inspection gauge will be able to travel the entire length of the pipeline. Currently, studies are being finalised which describe the technical design of these gauges. Other pipeline projects, such as Franpipe and Langeled, show that long distance pigging is feasible for long high-pressure, large-diameter pipes. 
Together with the applications for a platform and the pipeline system submitted in December 2007, Nord Stream provided an environmental study that describes the potential impact of the pipelines on the environment. This report is equivalent to an Environmental Impact Assessment (EIA) for the Swedish part of the project and was provided even though it is not required under Swedish law.
As already announced in December, Nord Stream will supplement its application documentation for the pipeline system in accordance with the government's request and in accordance with Swedish and international law. Nord Stream believes that all prerequisites have been met to start dialogue with the Swedish government about this important project for meeting ’s energy supply needs and protecting the climate. 

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Partners Deliver Modular Floating Tidal Energy Platform

A group of offshore companies, including Bluewater, Damen and Van Oord among others, has partnered for a floating tidal energy platform a project to generate clean electricity,

Statoil Invests $1.5b in US Offshore Project

Statoil together with co-owners in the Stampede development in the Gulf of Mexicohas sanctioned the Stampede project in the U.S. Gulf of Mexico. Statoil said it will invest $1.

Experimental Floating Wind Farm Nears Installation

Launched in March 2012, the Fukushima experimental offshore floating wind farm project sponsored by the Ministry of Economy, Trade and Industry is nearing the installation

 
 
Maritime Careers / Shipboard Positions Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1324 sec (8 req/sec)